Select The Blank
Question
Number of defects in an individual component, like gear, shaft, wheel etc can be monitored through ________ type of control chart.
Correct Answer
c-chart
Your Answer
c-chart
True/False
Question
Non-availability of files /document in time is a problem to be addressed by office TPM.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
Check sheet is easy to use because it is :-
Correct Answer
Simplest tool
Your Answer
Simplest tool
Multiple Choice Single Answer
Question
Benchmarking helps to identify the gap between the current performance of the organization and the :-
Correct Answer
Performance of the best organization
Your Answer
Performance of the best organization
True/False
Question
Flow chart is pictorial representation of the steps in production control.
Correct Answer
False
Your Answer
True
Multiple Choice Multiple Answer
Question
Breakdown problem may be stratified by :-
Correct Answer
Sections , Machines , Type of breakdown (e.g mech. Or electrical)
Your Answer
Sections , Machines , Type of breakdown (e.g mech. Or electrical)
Select The Blank
Question
A control chart to exhibit counted data on number of defect is called ________.
Correct Answer
c-chart
Your Answer
c-chart
Select The Blank
Question
Procedure for implementation of TPM consists of ________ numbers of steps.
Correct Answer
12
Your Answer
8
Select The Blank
Question
Capability index Cp = ________
Correct Answer
Specification width/process width
Your Answer
Specification width/process width
Multiple Choice Single Answer
Question
Pareto's analysis underlines & operates philosophy of :-
Correct Answer
Vital few = trivial many
Your Answer
Vital few = trivial many
True/False
Question
Kanban signals are required when assembly work, subassembly work and manufacturing at parts is carried out at different locations.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
To reduce clamping & declamping time, following actions are desirable :-
Correct Answer
Standardize clamping bolts / screws , Cut off unnecessary threads , Use quick clamping device
Your Answer
Standardize clamping bolts / screws , Cut off unnecessary threads , Use quick clamping device
Select The Blank
Question
Benchmarking allows exchange of ________ between the benchmarking partners.
Correct Answer
Information
Your Answer
Information
Multiple Choice Multiple Answer
Question
TQM can never flourish if the staff are:-
Correct Answer
Worried about losing jobs , Afraid of being reprimanded if there are mistakes , Scared of their bosses
Your Answer
Worried about losing jobs , Afraid of being reprimanded if there are mistakes , Scared of their bosses
True/False
Question
In bar graph each bar is of same height.
Correct Answer
False
Your Answer
False
Multiple Choice Multiple Answer
Question
During SMED implementation, primary study consists of :-
Correct Answer
Equipment analysis , Setup change analysis , Preparation items (storage place , method) analysis
Your Answer
Equipment analysis , Setup change analysis , Preparation items (storage place , method) analysis
True/False
Question
Daily work management can also be extended to non manufacturing areas like procurement, QA, HRD etc.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Types of Poka-Yoke are :-
Correct Answer
Prevention type Poka-Yoke , Detection type Poka-Yoke
Your Answer
Prevention type Poka-Yoke , Detection type Poka-Yoke
Multiple Choice Single Answer
Question
Quality problem solving tool is used to :-
Correct Answer
Improve quality
Your Answer
Save time
True/False
Question
Along with problem solving tools experience and judgment is also used.
Correct Answer
True
Your Answer
False
Select The Blank
Question
JIT advocates the philosophy at elimination of waste from system which occurs due to ________.
Correct Answer
Over Production
Your Answer
Over Production
True/False
Question
Without measuring initial performance, target can't be set.
Correct Answer
True
Your Answer
False
Multiple Choice Multiple Answer
Question
An erratic patterns falling above & below the control limits indicates :-
Correct Answer
Defect in materials , Frequent adjustment of machines , Poorly trained operators
Your Answer
Defect in materials , Frequent adjustment of machines , Poorly trained operators
True/False
Question
Sample size for the construction of p-chart are larger than X bar-R chart.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Histogram is an important diagnostic tool. Analysis of the histogram gives :-
Correct Answer
It shows cause which affects the process , An idea of what is happening to the process , Whether the process is capable of meeting process or not i.e. around correct average & within specific limits
Your Answer
An idea of what is happening to the process , Whether the process is capable of meeting process or not i.e. around correct average & within specific limits , A bird's eye view of the variation
Multiple Choice Single Answer
Question
Productivity improves by :-
Correct Answer
Voluntary participants of everyone
Your Answer
Voluntary participants of everyone
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Select The Blank
Question
________ is management skill.
Correct Answer
Delegation
Your Answer
Delegation
Multiple Choice Multiple Answer
Question
While preparing scatter diagram following precautions are to be taken :-
Correct Answer
Data should be properly stratified & should be collected for full range , Scale selected should be right to avoid wrong conclusions , Data should be free from bias or undue importance
Your Answer
Data should be properly stratified & should be collected for full range
True/False
Question
In cellular manufacturing system cell may consist of a single machine or more than one machine arranged in line.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
Check sheet is easy to use because it is :-
Correct Answer
Simplest tool
Your Answer
Simplest tool
True/False
Question
Kanban signals are required when assembly work, subassembly work and manufacturing at parts is carried out at different locations.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
Histogram always indicates :-
Correct Answer
Only height
Your Answer
Only height
Multiple Choice Single Answer
Question
Flow charts are drawn to document a process by charting the task performed and :-
Correct Answer
The sequence in which tasks are performed
Your Answer
The sequence in which tasks are performed
Multiple Choice Multiple Answer
Question
Best practices for standardization in implementing Seiketsu are :-
Correct Answer
Create as many visual control systems as possible , Use colour code system for easy control , Fix one colour (e.g. Red) for danger zones/out of controls
Your Answer
Create as many visual control systems as possible , Use colour code system for easy control , Display warning notices
Multiple Choice Single Answer
Question
Empowerment means making best use of the firm's most valuable resource, namely:-
Correct Answer
Human
Your Answer
Human
Multiple Choice Multiple Answer
Question
Process can be made capable by :-
Correct Answer
Examine possibility of relaxing specification , Reducing process variability , Bringing target & average to fall at the same point
Your Answer
Reducing process variability , Bringing target & average to fall at the same point , Examine possibility of relaxing specification
Multiple Choice Multiple Answer
Question
Role of champions are :-
Correct Answer
Approve six sigma projects , Remove road block in the path of six sigma implementation , Monitor progress of six sigma projects
Your Answer
Approve six sigma projects , Remove road block in the path of six sigma implementation , Monitor progress of six sigma projects
Multiple Choice Single Answer
Question
A workshop is to be treated as :-
Correct Answer
Place where one's creativity can be applied
Your Answer
Place of maximum physical labour
Select The Blank
Question
By improving layout MUDA, due to ________ can be eliminated.
Correct Answer
Motion
Your Answer
Over production
Multiple Choice Multiple Answer
Question
Remedial actions for error of misunderstanding is :-
Correct Answer
Training , Checking in advance , Standardizing work procedures
Your Answer
Training , Checking in advance , Standardizing work procedures
Multiple Choice Single Answer
Question
JIT manufacturing emphasizes workplace improvement through :-
Correct Answer
5 'S'
Your Answer
5 'S'
True/False
Question
Without review PDCA cycle not completed.
Correct Answer
True
Your Answer
True
Select The Blank
Question
To eliminate muda of processing, ________ exercise is essential.
Correct Answer
ECRS
Your Answer
ECRS
True/False
Question
Control limits of control charts should be revised from time to time as additional data is accumulated.
Correct Answer
True
Your Answer
True
Select The Blank
Question
________ participants in monthly meeting(MRM)
Correct Answer
GM, operation heads, corporate functional heads
Your Answer
GM, operation heads, corporate functional heads
Select The Blank
Question
Suppliers may________ their prices to cover for cost of delivery, small production run etc.
Correct Answer
Raise
Your Answer
Raise
True/False
Question
Create as many visual controls as possible to achieve visual management is the principle of "Shitsuke"
Correct Answer
True
Your Answer
False
True/False
Question
Flow charts are used to train new employees by providing documented description of the task involved.
Correct Answer
True
Your Answer
True
Select The Blank
Question
Poka-Yoke devices under category use ________ to distinguish between similar parts which may be assembled in wrong position.
Correct Answer
Color coding
Your Answer
Color coding
Multiple Choice Single Answer
Question
Quality problem solving tool is used to :-
Correct Answer
Improve quality
Your Answer
Improve quality
Match The Following
Question
Correct Answer
Your Answer
Any thing misplaced should be visual immediately
Seiketsu
Display Colour codes meanings
Unrepairable tool or equipments
To be scrapped under Seiri
To be scrapped under Seiri
Colour coding essential throughout but
Display Colour codes meanings
Colour codes as per departments
Surprise Audit any time should shout consistent good housekeeping
Shitsuke for maintenance of 4-S
Seiketsu
Multiple Choice Single Answer
Question
5-S technique is useful to:
Correct Answer
To all places including homes
Your Answer
To all places including homes
Multiple Choice Single Answer
Question
Zero loss concept means :-
Correct Answer
Zero accident, zero defect, zero breakdown
Your Answer
Zero accident, zero defect, zero breakdown
Select The Blank
Question
Kaizen is ________ supported process.
Correct Answer
Management
Your Answer
Management
True/False
Question
By cutting the cost of quality, profitability decreases.
Correct Answer
False
Your Answer
False
Multiple Choice Single Answer
Question
The area enclosed under normal distribution curve between mean +3standard deviation is :-
Correct Answer
0.9973
Your Answer
0.9973
Select The Blank
Question
Poka Yoke is ________.
Correct Answer
Simple technique
Your Answer
Simple technique
Multiple Choice Single Answer
Question
The JIT Philosophy recommends attainment of flexibility by :-
Correct Answer
Contracting all lead times
Your Answer
Contracting all lead times
Multiple Choice Multiple Answer
Question
Causes of Muda of transport are :-
Correct Answer
Faulty layout , Over production
Your Answer
Faulty layout , Over production
Multiple Choice Multiple Answer
Question
For the presentation of the quality circle project what is required is :-
Correct Answer
Presentation skills , Graphical data , Progressive efforts of the team work
Your Answer
Presentation skills , Graphical data
Select The Blank
Question
________ is responsible for effective implementation of action plan's under TPM.
Correct Answer
Steering committee
Your Answer
Steering committee
Match The Following
Question
Correct Answer
Your Answer
4 th level in six sigma organization
Green Belts
Green Belts
1 st level in six sigma organization
Champions
Champions
2 nd level in six sigma organization
Master Black Belts
Master Black Belts
3 rd level in six sigma organization
Black Belts
Black Belts
Multiple Choice Multiple Answer
Question
Benefits of TQM are :-
Correct Answer
Greater customer satisfaction , Lower manufacturing cost
Your Answer
Greater customer satisfaction , Lower manufacturing cost
Multiple Choice Single Answer
Question
Vilfredo Pareto had discovered a universal law as :-
Correct Answer
"around 20% of the activity causes 80% of the effect"
Your Answer
"around 20% of the activity causes 80% of the effect"
Multiple Choice Multiple Answer
Question
Implementation of TPM in Indian industries is difficult due to :-
Correct Answer
Lack of knowledge of the TPM , Resistance to change , Fear to loss of job
Your Answer
Lack of knowledge of the TPM , Resistance to change , Fear to loss of job
Multiple Choice Multiple Answer
Question
Some steps for stratification are :-
Correct Answer
Define the problem & identify the stratification variables , Sort out data into categories & summarise information in each category , Present the information in graphical form & study, decide if further stratification is required?
Your Answer
Define the problem & identify the stratification variables , Sort out data into categories & summarise information in each category , Present the information in graphical form & study, decide if further stratification is required?
Select The Blank
Question
Each quality characteristic has permitted variation & is equal to ________.
Correct Answer
USL - LSL
Your Answer
USL - LSL
Select The Blank
Question
Flow chart helps to provide clarity of the ________ without visiting actual spot.
Correct Answer
Process
Your Answer
Process
True/False
Question
Automation can correct the basic faults of a improper setup process.
Correct Answer
False
Your Answer
True
Multiple Choice Single Answer
Question
In problem solving the best alternative is that :-
Correct Answer
Which best meets the criteria
Your Answer
Which best meets the criteria
True/False
Question
Benefits of DWN is faster response to customer needs.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Types of Poka-Yoke are :-
Correct Answer
Prevention type Poka-Yoke , Detection type Poka-Yoke
Your Answer
Prevention type Poka-Yoke , Detection type Poka-Yoke
True/False
Question
Daily work management can also be extended to non manufacturing areas like procurement, QA, HRD etc.
Correct Answer
True
Your Answer
True
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Select The Blank
Question
Cp for six sigma process is ________
Correct Answer
2
Your Answer
2
True/False
Question
Operator monitoring a machine while machine works on auto cycle is an example of muda of waiting.
Correct Answer
True
Your Answer
False
Select The Blank
Question
________ PDCA cycle is the systematic approach towards meeting the target.
Correct Answer
Kaoishikawa
Your Answer
Deming
Multiple Choice Multiple Answer
Question
As benchmark in Japan seiso activities means :-
Correct Answer
Everyone, clerk to officer does cleaning his area , No sweeper or cleaner employees , Every family does cleaning of pavement of their residence
Your Answer
Everyone, clerk to officer does cleaning his area , No sweeper or cleaner employees , Every family does cleaning of pavement of their residence
Multiple Choice Multiple Answer
Question
Breakdown problem may be stratified by :-
Correct Answer
Sections , Machines , Type of breakdown (e.g mech. Or electrical)
Your Answer
Sections , Machines , Type of breakdown (e.g mech. Or electrical)
Multiple Choice Multiple Answer
Question
After finding out the solution & working on it, the equally important job is :-
Correct Answer
Prepare for the presentation of your work , Explain the progress by presentation to steering committee , Convince committee for financial help for running the project
Your Answer
Prepare for the presentation of your work , Explain the progress by presentation to steering committee , Convince committee for financial help for running the project
Select The Blank
Question
A ________ is an excellent device to condense & present large mass of data in an elegant form.
Correct Answer
Frequency distribution
Your Answer
Frequency distribution
Match The Following
Question
Correct Answer
Your Answer
Hidden faults come out while implementing.
Cleaning yourself your equipments
shitsuke
Fix the place of items, tools as per frequency of use
Seiri
Seiton
Responsibility same from top to bottom
Seiso
Cleaning yourself your equipments
Evolve standard operating procedure & implement.
Seiketsu
Seiketsu
Multiple Choice Single Answer
Question
Seiton means
Correct Answer
Code Numbers to item as well as racks & drawers
Your Answer
Code Numbers to item as well as racks & drawers
True/False
Question
np chart unlike P chart records the 'number of defective' instead of "fraction or proportion of defectives".
Correct Answer
True
Your Answer
False
Multiple Choice Single Answer
Question
One Green Belt may head a team of :-
Correct Answer
20 employees
Your Answer
20 employees
Select The Blank
Question
________ is the critical element of TQM.
Correct Answer
Focus on customer
Your Answer
Focus on customer
Multiple Choice Single Answer
Question
Requirement of more machines, is an example of :-
Correct Answer
Muda of overproduction
Your Answer
Muda of overproduction
Multiple Choice Single Answer
Question
Accountability means :-
Correct Answer
Responsibility of Business Results
Your Answer
Responsibility Execution or Action
Select The Blank
Question
Benchmarking allows exchange of ________ between the benchmarking partners.
Correct Answer
Information
Your Answer
Information
Multiple Choice Multiple Answer
Question
Actions that can be thought for the process having process capability is higher than specification tolerance are
Correct Answer
100 % inspection is required , Reduce variability , Possibility of squeezing tolerances
Your Answer
100 % inspection is required , Reduce variability
Multiple Choice Single Answer
Question
To provide flexibility to supervisors in allocation of task, JIT emphasizes :-
Correct Answer
Multiskilled operators
Your Answer
Multiskilled operators
Multiple Choice Multiple Answer
Question
The aim of education & training under TPM is :-
Correct Answer
To develop abilities to respond quickly to abnormalities , To develop abilities to discover analyze malfunction
Your Answer
To develop abilities to respond quickly to abnormalities , To develop abilities to discover analyze malfunction , To have multiskilled employees in all departments
Multiple Choice Multiple Answer
Question
Typical examples of process benchmark are :-
Correct Answer
Procurement procedures , Budgeting , Recruitment
Your Answer
Procurement procedures , Budgeting , Recruitment
True/False
Question
Along with problem solving tools experience and judgment is also used.
Correct Answer
True
Your Answer
True
Select The Blank
Question
A 'Radar chart' is used to portray ________ strength or weakness of the activity.
Correct Answer
Relative
Your Answer
Relative
True/False
Question
Exercise to identify MURA, MUDA & MURI is not helpful to identify problems.
Correct Answer
False
Your Answer
False
Select The Blank
Question
In traditional purchasing ________ inventory is required.
Correct Answer
Plenty of
Your Answer
Minimum
Multiple Choice Single Answer
Question
Control chart can be used as :-
Correct Answer
Process monitoring tool
Your Answer
Process monitoring tool
Multiple Choice Single Answer
Question
Productivity improves by :-
Correct Answer
Voluntary participants of everyone
Your Answer
Voluntary participants of everyone
Multiple Choice Multiple Answer
Question
Tools and techniques for six sigma are :-
Correct Answer
Process mapping , FMEA , QFD
Your Answer
Process mapping , FMEA , QFD
Select The Blank
Question
World class benchmarking candidate in 'Quality' is ________.
Correct Answer
Motorola
Your Answer
Motorola
True/False
Question
Seiso prevents the potential problems by discovering abnormalities while cleaning your own area.
Correct Answer
True
Your Answer
True
Select The Blank
Question
________ is an effect due to the muda of defect.
Correct Answer
Wear & tear of parts while disassembling
Your Answer
Wear & tear of parts while disassembling
Multiple Choice Single Answer
Question
Quality circle should consist adequate experienced members between :-
Correct Answer
8 to 10
Your Answer
8 to 10
Select The Blank
Question
In scatter diagram "________" relationship is said to exist when value of 'y' decreases as the value of 'x' increases.
Correct Answer
Strong negative
Your Answer
Strong negative
Multiple Choice Single Answer
Question
POP is :-
Correct Answer
Process Oriented Management
Your Answer
Process Oriented Management
True/False
Question
TQM improves the quality by improving processes.
Correct Answer
True
Your Answer
True
True/False
Question
Generally time interval should be proportional to the average frequency of out of control conditions.
Correct Answer
True
Your Answer
False
Multiple Choice Multiple Answer
Question
Problem solving tools used for Root cause analysis are :-
Correct Answer
Check sheet , Pareto analysis , Fish bone analysis
Your Answer
Check sheet , Pareto analysis , Fish bone analysis
Select The Blank
Question
Good ________ is the asset to acquire the success of quality circle.
Correct Answer
Teamwork
Your Answer
Teamwork
Multiple Choice Multiple Answer
Question
The results oriented efforts of the quality circle should also include :-
Correct Answer
Efforts to avoid the problem permanently , Ultimate aim of the customers satisfaction , Attacking the real root causes & all possibilities
Your Answer
Efforts to avoid the problem permanently , Ultimate aim of the customers satisfaction , Attacking the real root causes & all possibilities
True/False
Question
Process capability index Cp is a measure of capability of the process to meet the specification limits.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Histogram is an important diagnostic tool. Analysis of the histogram gives :-
Correct Answer
It shows cause which affects the process , An idea of what is happening to the process , Whether the process is capable of meeting process or not i.e. around correct average & within specific limits
Your Answer
It shows cause which affects the process , An idea of what is happening to the process , Whether the process is capable of meeting process or not i.e. around correct average & within specific limits
True/False
Question
Any withdrawal without C-kanban is not permitted.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
During the steps of Deming cycle of PDCA what is important?
Correct Answer
Plan unitedly for the target within reach , Make plan active by "doing it" i.e. everyone working , After some time check the results for success
Your Answer
Plan unitedly for the target within reach , Make plan active by "doing it" i.e. everyone working , After some time check the results for success
Multiple Choice Single Answer
Question
Discussion on people, problem & role play exercise helps to develop :-
Correct Answer
Counseling skill
Your Answer
Counseling skill
Match The Following
Question
Correct Answer
Your Answer
LCLnp
n p - 3 ( sq.root( n p( 1- p )))
n p - 3 ( sq.root( n p( 1- p )))
UCLp
p + 3 ( sq.root( p ( 1 - p ) / n ))
p + 3 ( sq.root( p ( 1 - p ) / n ))
LCLp
p - 3 ( sq.root( p ( 1- p ) / n))
p - 3 ( sq.root( p ( 1- p ) / n))
UCLnp
n p + 3 ( sq.root( n p ( 1- p )))
n p + 3 ( sq.root( n p ( 1- p )))
Multiple Choice Single Answer
Question
TPM implementation is done through:-
Correct Answer
Small group
Your Answer
Small group
Multiple Choice Single Answer
Question
To hold the customer to do business with you :-
Correct Answer
Reduce the amount of time, the customer spend till he receive service
Your Answer
Increase the amount of time, the customer spend till he receive service
Multiple Choice Multiple Answer
Question
During SMED implementation, primary study consists of :-
Correct Answer
Equipment analysis , Setup change analysis , Preparation items (storage place , method) analysis
Your Answer
Equipment analysis , Setup change analysis , Converting internal setup into external setup
True/False
Question
Everyone in the team of quality should target his own benefits i.e. promotion, etc.
Correct Answer
False
$$$$$$$$$$$$$$$$$$
Select The Blank
Question Cp for six sigma process is ________
Correct Answer 2
Your Answer 2
True/False
Question Operator monitoring a machine while machine works on auto cycle is an example of muda of waiting.
Correct Answer True
Your Answer False
Select The Blank
Question ________ PDCA cycle is the systematic approach towards meeting the target.
Correct Answer Kaoishikawa
Your Answer Deming
Multiple Choice Multiple Answer
Question As benchmark in Japan seiso activities means :-
Correct Answer Everyone, clerk to officer does cleaning his area , No sweeper or cleaner employees , Every family does cleaning of pavement of their residence
Your Answer Everyone, clerk to officer does cleaning his area , No sweeper or cleaner employees , Every family does cleaning of pavement of their residence
Multiple Choice Multiple Answer
Question Breakdown problem may be stratified by :-
Correct Answer Sections , Machines , Type of breakdown (e.g mech. Or electrical)
Your Answer Sections , Machines , Type of breakdown (e.g mech. Or electrical)
Multiple Choice Multiple Answer
Question After finding out the solution & working on it, the equally important job is :-
Correct Answer Prepare for the presentation of your work , Explain the progress by presentation to steering committee , Convince committee for financial help for running the project
Your Answer Prepare for the presentation of your work , Explain the progress by presentation to steering committee , Convince committee for financial help for running the project
Select The Blank
Question A ________ is an excellent device to condense & present large mass of data in an elegant form.
Correct Answer Frequency distribution
Your Answer Frequency distribution
Match The Following
Question Correct Answer Your Answer
Hidden faults come out while implementing. Cleaning yourself your equipments shitsuke
Fix the place of items, tools as per frequency of use Seiri Seiton
Responsibility same from top to bottom Seiso Cleaning yourself your equipments
Evolve standard operating procedure & implement. Seiketsu Seiketsu
Multiple Choice Single Answer
Question Seiton means
Correct Answer Code Numbers to item as well as racks & drawers
Your Answer Code Numbers to item as well as racks & drawers
True/False
Question np chart unlike P chart records the 'number of defective' instead of "fraction or proportion of defectives".
Correct Answer True
Your Answer False
Multiple Choice Single Answer
Question One Green Belt may head a team of :-
Correct Answer 20 employees
Your Answer 20 employees
Select The Blank
Question ________ is the critical element of TQM.
Correct Answer Focus on customer
Your Answer Focus on customer
Multiple Choice Single Answer
Question Requirement of more machines, is an example of :-
Correct Answer Muda of overproduction
Your Answer Muda of overproduction
Multiple Choice Single Answer
Question Accountability means :-
Correct Answer Responsibility of Business Results
Your Answer Responsibility Execution or Action
Select The Blank
Question Benchmarking allows exchange of ________ between the benchmarking partners.
Correct Answer Information
Your Answer Information
Multiple Choice Multiple Answer
Question Actions that can be thought for the process having process capability is higher than specification tolerance are
Correct Answer 100 % inspection is required , Reduce variability , Possibility of squeezing tolerances
Your Answer 100 % inspection is required , Reduce variability
Multiple Choice Single Answer
Question To provide flexibility to supervisors in allocation of task, JIT emphasizes :-
Correct Answer Multiskilled operators
Your Answer Multiskilled operators
Multiple Choice Multiple Answer
Question The aim of education & training under TPM is :-
Correct Answer To develop abilities to respond quickly to abnormalities , To develop abilities to discover analyze malfunction
Your Answer To develop abilities to respond quickly to abnormalities , To develop abilities to discover analyze malfunction , To have multiskilled employees in all departments
Multiple Choice Multiple Answer
Question Typical examples of process benchmark are :-
Correct Answer Procurement procedures , Budgeting , Recruitment
Your Answer Procurement procedures , Budgeting , Recruitment
True/False
Question Along with problem solving tools experience and judgment is also used.
Correct Answer True
Your Answer True
Select The Blank
Question A 'Radar chart' is used to portray ________ strength or weakness of the activity.
Correct Answer Relative
Your Answer Relative
True/False
Question Exercise to identify MURA, MUDA & MURI is not helpful to identify problems.
Correct Answer False
Your Answer False
Select The Blank
Question In traditional purchasing ________ inventory is required.
Correct Answer Plenty of
Your Answer Minimum
Multiple Choice Single Answer
Question Control chart can be used as :-
Correct Answer Process monitoring tool
Your Answer Process monitoring tool
Multiple Choice Single Answer
Question Productivity improves by :-
Correct Answer Voluntary participants of everyone
Your Answer Voluntary participants of everyone
Multiple Choice Multiple Answer
Question Tools and techniques for six sigma are :-
Correct Answer Process mapping , FMEA , QFD
Your Answer Process mapping , FMEA , QFD
Select The Blank
Question World class benchmarking candidate in 'Quality' is ________.
Correct Answer Motorola
Your Answer Motorola
True/False
Question Seiso prevents the potential problems by discovering abnormalities while cleaning your own area.
Correct Answer True
Your Answer True
Select The Blank
Question ________ is an effect due to the muda of defect.
Correct Answer Wear & tear of parts while disassembling
Your Answer Wear & tear of parts while disassembling
Multiple Choice Single Answer
Question Quality circle should consist adequate experienced members between :-
Correct Answer 8 to 10
Your Answer 8 to 10
Select The Blank
Question In scatter diagram "________" relationship is said to exist when value of 'y' decreases as the value of 'x' increases.
Correct Answer Strong negative
Your Answer Strong negative
Multiple Choice Single Answer
Question POP is :-
Correct Answer Process Oriented Management
Your Answer Process Oriented Management
True/False
Question TQM improves the quality by improving processes.
Correct Answer True
Your Answer True
True/False
Question Generally time interval should be proportional to the average frequency of out of control conditions.
Correct Answer True
Your Answer False
Multiple Choice Multiple Answer
Question Problem solving tools used for Root cause analysis are :-
Correct Answer Check sheet , Pareto analysis , Fish bone analysis
Your Answer Check sheet , Pareto analysis , Fish bone analysis
Select The Blank
Question Good ________ is the asset to acquire the success of quality circle.
Correct Answer Teamwork
Your Answer Teamwork
Multiple Choice Multiple Answer
Question The results oriented efforts of the quality circle should also include :-
Correct Answer Efforts to avoid the problem permanently , Ultimate aim of the customers satisfaction , Attacking the real root causes & all possibilities
Your Answer Efforts to avoid the problem permanently , Ultimate aim of the customers satisfaction , Attacking the real root causes & all possibilities
True/False
Question Process capability index Cp is a measure of capability of the process to meet the specification limits.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question Histogram is an important diagnostic tool. Analysis of the histogram gives :-
Correct Answer It shows cause which affects the process , An idea of what is happening to the process , Whether the process is capable of meeting process or not i.e. around correct average & within specific limits
Your Answer It shows cause which affects the process , An idea of what is happening to the process , Whether the process is capable of meeting process or not i.e. around correct average & within specific limits
True/False
Question Any withdrawal without C-kanban is not permitted.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question During the steps of Deming cycle of PDCA what is important?
Correct Answer Plan unitedly for the target within reach , Make plan active by "doing it" i.e. everyone working , After some time check the results for success
Your Answer Plan unitedly for the target within reach , Make plan active by "doing it" i.e. everyone working , After some time check the results for success
Multiple Choice Single Answer
Question Discussion on people, problem & role play exercise helps to develop :-
Correct Answer Counseling skill
Your Answer Counseling skill
Match The Following
Question Correct Answer Your Answer
LCLnp n p - 3 ( sq.root( n p( 1- p ))) n p - 3 ( sq.root( n p( 1- p )))
UCLp p + 3 ( sq.root( p ( 1 - p ) / n )) p + 3 ( sq.root( p ( 1 - p ) / n ))
LCLp p - 3 ( sq.root( p ( 1- p ) / n)) p - 3 ( sq.root( p ( 1- p ) / n))
UCLnp n p + 3 ( sq.root( n p ( 1- p ))) n p + 3 ( sq.root( n p ( 1- p )))
Multiple Choice Single Answer
Question TPM implementation is done through:-
Correct Answer Small group
Your Answer Small group
Multiple Choice Single Answer
Question To hold the customer to do business with you :-
Correct Answer Reduce the amount of time, the customer spend till he receive service
Your Answer Increase the amount of time, the customer spend till he receive service
Multiple Choice Multiple Answer
Question During SMED implementation, primary study consists of :-
Correct Answer Equipment analysis , Setup change analysis , Preparation items (storage place , method) analysis
Your Answer Equipment analysis , Setup change analysis , Converting internal setup into external setup
True/False
Question Everyone in the team of quality should target his own benefits i.e. promotion, etc.
Correct Answer False
Your Answer False
Select The Blank
Question
Due to SMED, ________ time cuts down.
Correct Answer
Waiting
Your Answer
Operation
Multiple Choice Multiple Answer
Question
Actions that can be thought for the process having process capability is smaller than specification tolerance are:-
Correct Answer
Use of less precision machine , Possibility of squeezing tolerances , Reduction in inspection
Your Answer
Possibility of squeezing tolerances , Reduction in inspection , 100% inspection , Use of less precision machine
Multiple Choice Single Answer
Question
A control chart is also called as :-
Correct Answer
Run chart
Your Answer
Flow chart
Select The Blank
Question
Ideally the histogram will have a symmetrical ( i.e. also called as bell) shape tapering away on both sides from ________ value.
Correct Answer
Average
Your Answer
Maximum
Select The Blank
Question
Capability index Cp = ________
Correct Answer
Specification width/process width
Your Answer
Specification width/process width
Multiple Choice Single Answer
Question
Customer's return is an indicators of the MUDA of :-
Correct Answer
Defect
Your Answer
Defect
Multiple Choice Multiple Answer
Question
Customers complaints may be segregated by :-
Correct Answer
Nature of compliant i.e. defective product , Delayed delivery , Short/excess quantity
Your Answer
Nature of compliant i.e. defective product , Delayed delivery , Short/excess quantity , Payment problem
Select The Blank
Question
JIT helps to ________ the waste in the purchasing process.
Correct Answer
Eliminates
Your Answer
Eliminates
True/False
Question
Pie chart is also called as angular diagram.
Correct Answer
True
Your Answer
False
True/False
Question
Review is important step in problem solving.
Correct Answer
True
Your Answer
True
Select The Blank
Question
To assess effectiveness of training ________ is essential.
Correct Answer
Evaluation
Your Answer
Re training
Select The Blank
Question
Quality improvement team consists of departmental head with a chairperson who has easy access to the ________.
Correct Answer
Top management
Your Answer
Workmen
Multiple Choice Single Answer
Question
The area enclosed under normal distribution curve between mean +3standard deviation is :-
Correct Answer
0.9973
Your Answer
0.9545
Multiple Choice Single Answer
Question
In autonomus modules or cells, rate of production increases :-
Correct Answer
Number of operators increases
Your Answer
Number of operators increases
Multiple Choice Multiple Answer
Question
Histograms are useful to :-
Correct Answer
Measure the current pattern & extent of variation , Assess current conformance to specification & scope of improvement , Determine whether or not the process is in the state of control
Your Answer
Measure the current pattern & extent of variation , Assess current conformance to specification & scope of improvement , Determine whether or not the process is in the state of control , Do the analysis as per "parato diagram"
Multiple Choice Single Answer
Question
DOE stands for
Correct Answer
Design of Experiments
Your Answer
Degree of Evaluation
True/False
Question
Automation can correct the basic faults of a improper setup process.
Correct Answer
False
Your Answer
True
Multiple Choice Multiple Answer
Question
Limitation of quality circles are :-
Correct Answer
Problems headed by worker group must be simple & within their limit , Unions in India are reluctant , Management is also not open for union
Your Answer
Problems headed by worker group must be simple & within their limit , Unions in India are reluctant , Management is also not open for union , Worker attitude only for financial benefit
True/False
Question
Kanban signals are required when assembly work, subassembly work and manufacturing at parts is carried out at different locations.
Correct Answer
True
Your Answer
True
True/False
Question
Safety, hygiene and environment control is one of the pillar of TPM.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
During the steps of Deming cycle of PDCA what is important?
Correct Answer
Plan unitedly for the target within reach , Make plan active by "doing it" i.e. everyone working , After some time check the results for success
Your Answer
Plan unitedly for the target within reach , Make plan active by "doing it" i.e. everyone working , After some time check the results for success , Make your own methods for individual success
Multiple Choice Multiple Answer
Question
Initial list of prospective partners can be drawn on feedback information gathered from :-
Correct Answer
Winners of excellence award , Top rated companies in industry survey , Consultant
Your Answer
Winners of excellence award , Top rated companies in industry survey , Consultant , Employees
Multiple Choice Single Answer
Question
For customer satisfaction, checking point will be :-
Correct Answer
Obtaining feedback from concerned department
Your Answer
Obtaining feedback from concerned department
True/False
Question
Graph is a tabulated representation of the data which is easily understandable at a glance.
Correct Answer
False
Your Answer
True
Multiple Choice Multiple Answer
Question
Examples of Muda are :-
Correct Answer
Muda of over production , Muda of stock , Muda of defeat
Your Answer
Muda of over production , Muda of stock , Muda of defeat , Muda of competition
Multiple Choice Multiple Answer
Question
Causes of Muda of transport are :-
Correct Answer
Faulty layout , Over production
Your Answer
Faulty layout , Over production , Proper material handling equipment , Low rejection / rework
True/False
Question
Process capability refers to ability of the process to meet the design specification for a product or a service.
Correct Answer
True
Your Answer
True
Select The Blank
Question
________ is the root cause of the problems.
Correct Answer
Variation
Your Answer
Duplicating
Multiple Choice Single Answer
Question
Seiri means :-
Correct Answer
Destroying unwanted items after classifying the necessity
Your Answer
Destroying unwanted items after classifying the necessity
Select The Blank
Question
Poka Yoke is ________.
Correct Answer
Simple technique
Your Answer
Simple technique
Multiple Choice Single Answer
Question
Kaizen process is built on PDCA cycle, where P represents :-
Correct Answer
PLAN
Your Answer
PLAN
Multiple Choice Single Answer
Question
For normal distribution curve, skewness & kurtosis are :-
Correct Answer
Zero
Your Answer
One
Multiple Choice Single Answer
Question
"Cause & effect" diagram was developed by :-
Correct Answer
DR.Kaoru Ishikawa
Your Answer
DR.Kaoru Ishikawa
Multiple Choice Single Answer
Question
The concept of quality circle was mooted by :-
Correct Answer
Prof. Kaoishikawa
Your Answer
Japanese unit of scientist & engineers(JVSE)
True/False
Question
Seiso prevents the potential problems by discovering abnormalities while cleaning your own area.
Correct Answer
True
Your Answer
True
Match The Following
Question
Correct Answer
Your Answer
Kanban
Pull system
Statistical process control
Work standards
Best way of doing job
Best way of doing job
TPM
Reducing breakdown of machines
Reducing breakdown of machines
JIT
Waste elimination
Waste elimination
Select The Blank
Question
Basic objective of control chart is to ________ the variation due to chance & assignable cause.
Correct Answer
Separate out
Your Answer
Separate out
Multiple Choice Multiple Answer
Question
Benefits from SMED are :-
Correct Answer
Reduce work in process , Better average daily production , Increase capacity
Your Answer
Reduce work in process , Better average daily production , Increase capacity , Reduce productivity
Multiple Choice Multiple Answer
Question
Quality problems may be segregated by & regrouped by :-
Correct Answer
Machines , Workers , Materials
Your Answer
Machines , Workers , Materials , Suggestion
Select The Blank
Question
Histogram is a diagrammatic presentation of the ________ distribution of characteristics such as strength, diameter, etc.
Correct Answer
Frequency
Your Answer
Frequency
True/False
Question
A radar chart is combination of a circle & line graph
Correct Answer
True
Your Answer
False
Select The Blank
Question
Kaizen is ________ supported process.
Correct Answer
Management
Your Answer
Customer
Multiple Choice Single Answer
Question
Theoretically, the normal curve can extend :-
Correct Answer
From - Infinity to + Infinity
Your Answer
From 0 to+ infinity
Match The Following
Question
Correct Answer
Your Answer
Control chart can be used
As process monitoring tool
Stability of the process
Control chart is a graphical method of checking
Stability of the process
For quality monitoring
Control chart can be used to determine
How much variability in the process is due to random causes & how much is due to assignable causes
How much variability in the process is due to random causes & how much is due to assignable causes
Control chart is a chart with UCL & LCL placed
At 3 Sigma distance on either side of the process average
At 6 Sigma distance on either side of the process average
Multiple Choice Multiple Answer
Question
Few main steps to construct a Histogram after deciding classes, class width & class boundaries are :-
Correct Answer
Compute mid-point of the class (cell) & fill up the tally sheet determining the cell or class into which each value falls , Count the tally marks i.e. frequency in each class & construct a histogram by plotting a bar graph for each class , Analyze & conclude whether process is is meeting the requirement or not & take connective actions if needed.
Your Answer
Compute mid-point of the class (cell) & fill up the tally sheet determining the cell or class into which each value falls , Count the tally marks i.e. frequency in each class & construct a histogram by plotting a bar graph for each class , Analyze & conclude whether process is is meeting the requirement or not & take connective actions if needed. , Do the Parato analysis as per 80%=20% rule
True/False
Question
Exercise to identify MURA, MUDA & MURI is not helpful to identify problems.
Correct Answer
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Few steps to construct a flow chart are :-
Correct Answer
Decide on the objective of flowchart & define boundaries of the process , Identify steps in the process & construct a draft of the flowchart , Review the draft & connect the changes as per review & name it & put the data & use it as 'Record'
True/False
Question Performance benchmarking does not involves comparison of financial ratios at the aggregate level.
Correct Answer False
Your Answer False
Multiple Choice Single Answer
Question Setup time includes :-
Correct Answer Internal setup time & External setup time
Your Answer Internal setup time & External setup time
Multiple Choice Single Answer
Question Participants of the groups for quality circles should be decided by :-
Correct Answer Employees coming together by their own enthusiasm
Your Answer Employees coming together by their own enthusiasm
Multiple Choice Single Answer
Question Check sheet are also used as :-
Correct Answer Data gathering & interpretation tool
Your Answer Data gathering & interpretation tool
Multiple Choice Single Answer
Question SMED means :-
Correct Answer Single minute exchange of dies
Your Answer Single minute exchange of dies
Match The Following
Question Correct Answer Your Answer
Productivity performance measurement Turnover employee Cost of quality
Financial performance measurement Sales of the months Sales of the months
Customer satisfaction measurement Customer complaints per period Customer complaints per period
Staff attitude measurement Employee satisfaction index Employee satisfaction index
Select The Blank
Question ________ is an effect due to the muda of defect.
Correct Answer Wear & tear of parts while disassembling
Your Answer Poor production planning & control
Select The Blank
Question If some defective parts are discovered by the subsequent process they should be returned to the ________ to prevent reoccurrence.
Correct Answer Preceding process
Your Answer Return to stores
Multiple Choice Multiple Answer
Question The results oriented efforts of the quality circle should also include :-
Correct Answer Efforts to avoid the problem permanently , Ultimate aim of the customers satisfaction , Attacking the real root causes & all possibilities
Your Answer Efforts to avoid the problem permanently , Publication or advertisement of your contribution , Attacking the real root causes & all possibilities
Match The Following
Question Correct Answer Your Answer
Parato diagram always indicates Magnitude of defects Philosophy of 20% of the activity causes 80% of the effect
Parato analysis underlines & operates on Philosophy of "vital few:trivial many" Philosophy of "vital few:trivial many"
Parato analysis is technique of identifying vital causes by Arranging data according to the descending order of their frequency of occurrence Arranging data according to the descending order of their frequency of occurrence
Parato diagram is a Bar graph with height or value drawn by Arranging data in descending order Magnitude of defects
Multiple Choice Multiple Answer
Question Few steps in construction in Radar chart are :-
Correct Answer Brainstorming to enlist characteristics which require to be evaluated & draw the circle & divide it into 'slices' equal to number of characteristics , The first slice begins at 12 noon. Then draw vertical line & calibrate it equal to the number of levels required , Draw concentric circles from each gradiation using 'o' point as centre
Your Answer Brainstorming to enlist characteristics which require to be evaluated & draw the circle & divide it into 'slices' equal to number of characteristics , The first slice begins at 12 noon. Then draw vertical line & calibrate it equal to the number of levels required , Draw concentric circles from each gradiation using 'o' point as centre
Select The Blank
Question 5 S audit result is discussed in ________ meeting.
Correct Answer Monthly
Your Answer Monthly
True/False
Question Fishbone analysis is used both in analysis & planning.
Correct Answer True
Your Answer False
Multiple Choice Single Answer
Question One Green Belt may head a team of :-
Correct Answer 20 employees
Your Answer 20 employees
Multiple Choice Multiple Answer
Question Role of champions are :-
Correct Answer Approve six sigma projects , Remove road block in the path of six sigma implementation , Monitor progress of six sigma projects
Your Answer Monitor progress of six sigma projects , Approve six sigma projects , Remove road block in the path of six sigma implementation
Multiple Choice Multiple Answer
Question To draw control charts, sample must be representative of homogeneous segment of production for which :-
Correct Answer The items of the sample should be from the same machine setting , The items should be of the same batch , Items should be made from the same raw material batch
Your Answer The items of the sample should be from the same machine setting , The items should be of the same batch , Items should be made from the same raw material batch
Multiple Choice Single Answer
Question Failure mode and effect analysis (FMEA) establish
Correct Answer Process failure and minimize frequency
Your Answer Process failure and minimize frequency
Multiple Choice Multiple Answer
Question What are the steps in deciding the benchmarking partner?
Correct Answer Decide level of benchmarking , List down a few prospective candidates of partnership , Collect information of short listed partners
Your Answer Decide level of benchmarking , List down a few prospective candidates of partnership , Collect information of short listed partners
Multiple Choice Single Answer
Question One Master Black Belt may head a team of :-
Correct Answer 15-20 Black Belts
Your Answer 15-20 Black Belts
Multiple Choice Single Answer
Question Competitive benchmarking involves identifying key competitive product, services or processes & comparing with those of :-
Correct Answer Main competitor
Your Answer Main competitor
Multiple Choice Single Answer
Question Implication of Quality problem is:-
Correct Answer Gap in performance
Your Answer Gap in performance
Select The Blank
Question Number of defects in an individual component, like gear, shaft, wheel etc can be monitored through ________ type of control chart.
Correct Answer c-chart
Your Answer c-chart
True/False
Question Non-availability of files /document in time is a problem to be addressed by office TPM.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Check sheet is easy to use because it is :-
Correct Answer Simplest tool
Your Answer Simplest tool
Multiple Choice Single Answer
Question Benchmarking helps to identify the gap between the current performance of the organization and the :-
Correct Answer Performance of the best organization
Your Answer Performance of the best organization
True/False
Question Flow chart is pictorial representation of the steps in production control.
Correct Answer False
Your Answer True
Multiple Choice Multiple Answer
Question Breakdown problem may be stratified by :-
Correct Answer Sections , Machines , Type of breakdown (e.g mech. Or electrical)
Your Answer Sections , Machines , Type of breakdown (e.g mech. Or electrical)
Select The Blank
Question A control chart to exhibit counted data on number of defect is called ________.
Correct Answer c-chart
Your Answer c-chart
Select The Blank
Question Procedure for implementation of TPM consists of ________ numbers of steps.
Correct Answer 12
Your Answer 8
Select The Blank
Question Capability index Cp = ________
Correct Answer Specification width/process width
Your Answer Specification width/process width
Multiple Choice Single Answer
Question Pareto's analysis underlines & operates philosophy of :-
Correct Answer Vital few = trivial many
Your Answer Vital few = trivial many
True/False
Question Kanban signals are required when assembly work, subassembly work and manufacturing at parts is carried out at different locations.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question To reduce clamping & declamping time, following actions are desirable :-
Correct Answer Standardize clamping bolts / screws , Cut off unnecessary threads , Use quick clamping device
Your Answer Standardize clamping bolts / screws , Cut off unnecessary threads , Use quick clamping device
Select The Blank
Question Benchmarking allows exchange of ________ between the benchmarking partners.
Correct Answer Information
Your Answer Information
Multiple Choice Multiple Answer
Question TQM can never flourish if the staff are:-
Correct Answer Worried about losing jobs , Afraid of being reprimanded if there are mistakes , Scared of their bosses
Your Answer Worried about losing jobs , Afraid of being reprimanded if there are mistakes , Scared of their bosses
True/False
Question In bar graph each bar is of same height.
Correct Answer False
Your Answer False
Multiple Choice Multiple Answer
Question During SMED implementation, primary study consists of :-
Correct Answer Equipment analysis , Setup change analysis , Preparation items (storage place , method) analysis
Your Answer Equipment analysis , Setup change analysis , Preparation items (storage place , method) analysis
True/False
Question Daily work management can also be extended to non manufacturing areas like procurement, QA, HRD etc.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question Types of Poka-Yoke are :-
Correct Answer Prevention type Poka-Yoke , Detection type Poka-Yoke
Your Answer Prevention type Poka-Yoke , Detection type Poka-Yoke
Multiple Choice Single Answer
Question Quality problem solving tool is used to :-
Correct Answer Improve quality
Your Answer Save time
True/False
Question Along with problem solving tools experience and judgment is also used.
Correct Answer True
Your Answer False
Select The Blank
Question JIT advocates the philosophy at elimination of waste from system which occurs due to ________.
Correct Answer Over Production
Your Answer Over Production
True/False
Question Without measuring initial performance, target can't be set.
Correct Answer True
Your Answer False
Multiple Choice Multiple Answer
Question An erratic patterns falling above & below the control limits indicates :-
Correct Answer Defect in materials , Frequent adjustment of machines , Poorly trained operators
Your Answer Defect in materials , Frequent adjustment of machines , Poorly trained operators
True/False
Question Sample size for the construction of p-chart are larger than X bar-R chart.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question Histogram is an important diagnostic tool. Analysis of the histogram gives :-
Correct Answer It shows cause which affects the process , An idea of what is happening to the process , Whether the process is capable of meeting process or not i.e. around correct average & within specific limits
Your Answer An idea of what is happening to the process , Whether the process is capable of meeting process or not i.e. around correct average & within specific limits , A bird's eye view of the variation
Multiple Choice Single Answer
Question Productivity improves by :-
Correct Answer Voluntary participants of everyone
Your Answer Voluntary participants of everyone
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Select The Blank
Question ________ is management skill.
Correct Answer Delegation
Your Answer Delegation
Multiple Choice Multiple Answer
Question While preparing scatter diagram following precautions are to be taken :-
Correct Answer Data should be properly stratified & should be collected for full range , Scale selected should be right to avoid wrong conclusions , Data should be free from bias or undue importance
Your Answer Data should be properly stratified & should be collected for full range
True/False
Question In cellular manufacturing system cell may consist of a single machine or more than one machine arranged in line.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Check sheet is easy to use because it is :-
Correct Answer Simplest tool
Your Answer Simplest tool
True/False
Question Kanban signals are required when assembly work, subassembly work and manufacturing at parts is carried out at different locations.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Histogram always indicates :-
Correct Answer Only height
Your Answer Only height
Multiple Choice Single Answer
Question Flow charts are drawn to document a process by charting the task performed and :-
Correct Answer The sequence in which tasks are performed
Your Answer The sequence in which tasks are performed
Multiple Choice Multiple Answer
Question Best practices for standardization in implementing Seiketsu are :-
Correct Answer Create as many visual control systems as possible , Use colour code system for easy control , Fix one colour (e.g. Red) for danger zones/out of controls
Your Answer Create as many visual control systems as possible , Use colour code system for easy control , Display warning notices
Multiple Choice Single Answer
Question Empowerment means making best use of the firm's most valuable resource, namely:-
Correct Answer Human
Your Answer Human
Multiple Choice Multiple Answer
Question Process can be made capable by :-
Correct Answer Examine possibility of relaxing specification , Reducing process variability , Bringing target & average to fall at the same point
Your Answer Reducing process variability , Bringing target & average to fall at the same point , Examine possibility of relaxing specification
Multiple Choice Multiple Answer
Question Role of champions are :-
Correct Answer Approve six sigma projects , Remove road block in the path of six sigma implementation , Monitor progress of six sigma projects
Your Answer Approve six sigma projects , Remove road block in the path of six sigma implementation , Monitor progress of six sigma projects
Multiple Choice Single Answer
Question A workshop is to be treated as :-
Correct Answer Place where one's creativity can be applied
Your Answer Place of maximum physical labour
Select The Blank
Question By improving layout MUDA, due to ________ can be eliminated.
Correct Answer Motion
Your Answer Over production
Multiple Choice Multiple Answer
Question Remedial actions for error of misunderstanding is :-
Correct Answer Training , Checking in advance , Standardizing work procedures
Your Answer Training , Checking in advance , Standardizing work procedures
Multiple Choice Single Answer
Question JIT manufacturing emphasizes workplace improvement through :-
Correct Answer 5 'S'
Your Answer 5 'S'
True/False
Question Without review PDCA cycle not completed.
Correct Answer True
Your Answer True
Select The Blank
Question To eliminate muda of processing, ________ exercise is essential.
Correct Answer ECRS
Your Answer ECRS
True/False
Question Control limits of control charts should be revised from time to time as additional data is accumulated.
Correct Answer True
Your Answer True
Select The Blank
Question ________ participants in monthly meeting(MRM)
Correct Answer GM, operation heads, corporate functional heads
Your Answer GM, operation heads, corporate functional heads
Select The Blank
Question Suppliers may________ their prices to cover for cost of delivery, small production run etc.
Correct Answer Raise
Your Answer Raise
True/False
Question Create as many visual controls as possible to achieve visual management is the principle of "Shitsuke"
Correct Answer True
Your Answer False
True/False
Question Flow charts are used to train new employees by providing documented description of the task involved.
Correct Answer True
Your Answer True
Select The Blank
Question Poka-Yoke devices under category use ________ to distinguish between similar parts which may be assembled in wrong position.
Correct Answer Color coding
Your Answer Color coding
Multiple Choice Single Answer
Question Quality problem solving tool is used to :-
Correct Answer Improve quality
Your Answer Improve quality
Match The Following
Question Correct Answer Your Answer
Any thing misplaced should be visual immediately Seiketsu Display Colour codes meanings
Unrepairable tool or equipments To be scrapped under Seiri To be scrapped under Seiri
Colour coding essential throughout but Display Colour codes meanings Colour codes as per departments
Surprise Audit any time should shout consistent good housekeeping Shitsuke for maintenance of 4-S Seiketsu
Multiple Choice Single Answer
Question 5-S technique is useful to:
Correct Answer To all places including homes
Your Answer To all places including homes
Multiple Choice Single Answer
Question Zero loss concept means :-
Correct Answer Zero accident, zero defect, zero breakdown
Your Answer Zero accident, zero defect, zero breakdown
Select The Blank
Question Kaizen is ________ supported process.
Correct Answer Management
Your Answer Management
True/False
Question By cutting the cost of quality, profitability decreases.
Correct Answer False
Your Answer False
Multiple Choice Single Answer
Question The area enclosed under normal distribution curve between mean +3standard deviation is :-
Correct Answer 0.9973
Your Answer 0.9973
Select The Blank
Question Poka Yoke is ________.
Correct Answer Simple technique
Your Answer Simple technique
Multiple Choice Single Answer
Question The JIT Philosophy recommends attainment of flexibility by :-
Correct Answer Contracting all lead times
Your Answer Contracting all lead times
Multiple Choice Multiple Answer
Question Causes of Muda of transport are :-
Correct Answer Faulty layout , Over production
Your Answer Faulty layout , Over production
Multiple Choice Multiple Answer
Question For the presentation of the quality circle project what is required is :-
Correct Answer Presentation skills , Graphical data , Progressive efforts of the team work
Your Answer Presentation skills , Graphical data
Select The Blank
Question ________ is responsible for effective implementation of action plan's under TPM.
Correct Answer Steering committee
Your Answer Steering committee
Match The Following
Question Correct Answer Your Answer
4 th level in six sigma organization Green Belts Green Belts
1 st level in six sigma organization Champions Champions
2 nd level in six sigma organization Master Black Belts Master Black Belts
3 rd level in six sigma organization Black Belts Black Belts
Multiple Choice Multiple Answer
Question Benefits of TQM are :-
Correct Answer Greater customer satisfaction , Lower manufacturing cost
Your Answer Greater customer satisfaction , Lower manufacturing cost
Multiple Choice Single Answer
Question Vilfredo Pareto had discovered a universal law as :-
Correct Answer "around 20% of the activity causes 80% of the effect"
Your Answer "around 20% of the activity causes 80% of the effect"
Multiple Choice Multiple Answer
Question Implementation of TPM in Indian industries is difficult due to :-
Correct Answer Lack of knowledge of the TPM , Resistance to change , Fear to loss of job
Your Answer Lack of knowledge of the TPM , Resistance to change , Fear to loss of job
Multiple Choice Multiple Answer
Question Some steps for stratification are :-
Correct Answer Define the problem & identify the stratification variables , Sort out data into categories & summarise information in each category , Present the information in graphical form & study, decide if further stratification is required?
Your Answer Define the problem & identify the stratification variables , Sort out data into categories & summarise information in each category , Present the information in graphical form & study, decide if further stratification is required?
Select The Blank
Question Each quality characteristic has permitted variation & is equal to ________.
Correct Answer USL - LSL
Your Answer USL - LSL
Select The Blank
Question Flow chart helps to provide clarity of the ________ without visiting actual spot.
Correct Answer Process
Your Answer Process
True/False
Question Automation can correct the basic faults of a improper setup process.
Correct Answer False
Your Answer True
Multiple Choice Single Answer
Question In problem solving the best alternative is that :-
Correct Answer Which best meets the criteria
Your Answer Which best meets the criteria
True/False
Question Benefits of DWN is faster response to customer needs.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question Types of Poka-Yoke are :-
Correct Answer Prevention type Poka-Yoke , Detection type Poka-Yoke
Your Answer Prevention type Poka-Yoke , Detection type Poka-Yoke
True/False
Question Daily work management can also be extended to non manufacturing areas like procurement, QA, HRD etc.
Correct ans : true
Multiple Choice Single Answer
Question 5-S technique is useful to:
Correct Answer To all places including homes
Your Answer To all places including homes
Multiple Choice Single Answer
Question Empowerment means making best use of the firm's most valuable resource, namely:-
Correct Answer Human
Your Answer Human
Select The Blank
Question Number of defects in an individual component, like gear, shaft, wheel etc can be monitored through ________ type of control chart.
Correct Answer c-chart
Your Answer c-chart
Multiple Choice Single Answer
Question TQM is a way to improve quality of product and service :-
Correct Answer Continuously
Your Answer Continuously
Multiple Choice Multiple Answer
Question Best practices for standardization in implementing Seiketsu are :-
Correct Answer Create as many visual control systems as possible , Use colour code system for easy control , Fix one colour (e.g. Red) for danger zones/out of controls
Your Answer Create as many visual control systems as possible , Use colour code system for easy control , Display warning notices
True/False
Question JIT is not possible for each and every item held as inventory
Correct Answer True
Your Answer False
True/False
Question Customer wise outstanding is discussed in daily work management meeting by operations head.
Correct Answer False
Your Answer False
Select The Blank
Question Poka-Yoke devices under category 'locating pins' to eliminate cause of ________
Correct Answer Incorrect positioning
Your Answer Incorrect positioning
Multiple Choice Single Answer
Question Customer's return is an indicators of the MUDA of :-
Correct Answer Defect
Your Answer Defect
Match The Following
Question Correct Answer Your Answer
Evolve standard operating procedure & implement. Seiketsu Seiketsu
Hidden faults come out while implementing. Cleaning yourself your equipments Seiso
Fix the place of items, tools as per frequency of use Seiri Seiton
Responsibility same from top to bottom Seiso shitsuke
Multiple Choice Single Answer
Question Accountability means :-
Correct Answer Responsibility of Business Results
Your Answer Responsibility Execution or Action
Multiple Choice Single Answer
Question Quality problem solving tool is used to :-
Correct Answer Improve quality
Your Answer Improve quality
True/False
Question Performance benchmarking does not involves comparison of financial ratios at the aggregate level.
Correct Answer False
Your Answer False
Multiple Choice Single Answer
Question Competitive benchmarking is usually conducted :-
Correct Answer Through third party research
Your Answer Through third party research
Multiple Choice Single Answer
Question Small groups forming a circle should consist of :-
Correct Answer Employees of different department related to the problem
Your Answer Employees of different department related to the problem
True/False
Question In cellular manufacturing system cell may consist of a single machine or more than one machine arranged in line.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question Histograms are useful to :-
Correct Answer Measure the current pattern & extent of variation , Assess current conformance to specification & scope of improvement , Determine whether or not the process is in the state of control
Your Answer Measure the current pattern & extent of variation , Assess current conformance to specification & scope of improvement , Determine whether or not the process is in the state of control
True/False
Question Non-availability of files /document in time is a problem to be addressed by office TPM.
Correct Answer True
Your Answer True
Select The Blank
Question A control chart to exhibit counted data on number of defect is called ________.
Correct Answer c-chart
Your Answer c-chart
True/False
Question Fishbone analysis is used both in analysis & planning.
Correct Answer True
Your Answer True
Select The Blank
Question Inspection activity for semi finished & finished component should be ________ to reduce muda of transport .
Correct Answer Decentralized
Your Answer Decentralized
Multiple Choice Multiple Answer
Question Scatter diagram is used :-
Correct Answer To discover relationship between two associated sets of data , To display the relationship between two variables , To confirm anticipated relationship between two variables / associated sets of data
Your Answer To discover relationship between two associated sets of data , To display the relationship between two variables , To confirm anticipated relationship between two variables / associated sets of data
Select The Blank
Question U shape arrangement of layout provides the operator ________ degree of mobility.
Correct Answer 360
Your Answer 360
True/False
Question Chance causes can not be identified.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question During the steps of Deming cycle of PDCA what is important?
Correct Answer Plan unitedly for the target within reach , Make plan active by "doing it" i.e. everyone working , After some time check the results for success
Your Answer Plan unitedly for the target within reach , Make plan active by "doing it" i.e. everyone working , After some time check the results for success
Multiple Choice Multiple Answer
Question Benefits of Quality maintenance are :-
Correct Answer Reduction in customer quality complaints , Reduction in inspection time
Your Answer Reduction in customer quality complaints , Reduction in inspection time
Multiple Choice Multiple Answer
Question Causes of Muda of transport are :-
Correct Answer Faulty layout , Over production
Your Answer Faulty layout , Over production
Multiple Choice Multiple Answer
Question Types of Poka-Yoke are :-
Correct Answer Prevention type Poka-Yoke , Detection type Poka-Yoke
Your Answer Prevention type Poka-Yoke , Detection type Poka-Yoke , Standards type Poka-Yoke
Multiple Choice Single Answer
Question Pie chart is also called as :-
Correct Answer Angular diagram
Your Answer Angular diagram
Multiple Choice Multiple Answer
Question The aim of education & training under TPM is :-
Correct Answer To develop abilities to respond quickly to abnormalities , To develop abilities to discover analyze malfunction
Your Answer To develop abilities to respond quickly to abnormalities , To develop abilities to discover analyze malfunction , To have multiskilled employees in all departments
Multiple Choice Multiple Answer
Question Material Supply on DSL basis helps :-
Correct Answer To eliminate handling , To reduce transporting , To reduce inspection
Your Answer To eliminate handling , To reduce transporting , To reduce inspection
Select The Blank
Question Poka Yoke designed to help operators to know immediately ________ of the defeat called detection type Poka-Yoke.
Correct Answer On occurrence
Your Answer On occurrence
Multiple Choice Multiple Answer
Question Typical examples of process benchmark are :-
Correct Answer Procurement procedures , Budgeting , Recruitment
Your Answer Procurement procedures , Budgeting , Recruitment
Multiple Choice Single Answer
Question The area enclosed under normal distribution curve between mean +2standard deviation is :-
Correct Answer 0.9545
Your Answer 1
True/False
Question Daily work management can also be extended to non manufacturing areas like procurement, QA, HRD etc.
Correct Answer True
Your Answer True
Match The Following
Question Correct Answer Your Answer
4 th level in six sigma organization Green Belts Green Belts
1 st level in six sigma organization Champions Champions
2 nd level in six sigma organization Master Black Belts Master Black Belts
3 rd level in six sigma organization Black Belts Black Belts
Select The Blank
Question ________ PDCA cycle is the systematic approach towards meeting the target.
Correct Answer Kaoishikawa
Your Answer Deming
Select The Blank
Question ________is serve as a stepping stone to TQM
Correct Answer ISO-9000 quality standard
Your Answer TPM
Select The Blank
Question Histogram is a diagrammatic presentation of the ________ distribution of characteristics such as strength, diameter, etc.
Correct Answer Frequency
Your Answer Frequency
Multiple Choice Single Answer
Question Through continuous improvement in the process & procedures, kobetsu-kaizen is continuously improve utilization of :-
Correct Answer Worker, equipment & material
Your Answer Worker, equipment & material
Multiple Choice Single Answer
Question Frequencies, values, tabulated in the frequency table, can be represented pictorially in the form of bar graph & this graph of frequency is called as :-
Correct Answer Histogram
Your Answer Histogram
Multiple Choice Multiple Answer
Question Muda of waiting is due to :-
Correct Answer Interrupted flow of work , Delay in movement of raw material from stores
Your Answer Interrupted flow of work , Delay in movement of raw material from stores
Select The Blank
Question CFT ( cross functional team ) consisting of ________
Correct Answer Operators, supervisors from different departments
Your Answer Operators, supervisors from different departments
Select The Blank
Question In PDCA cycle for benchmarking 'Identification of performance gap' is done in ________.
Correct Answer Checking
Your Answer Checking
Multiple Choice Multiple Answer
Question Management skill includes :-
Correct Answer Leadership , Motivation , Performance appraisals
Your Answer Leadership , Motivation
Multiple Choice Single Answer
Question Zero loss concept means :-
Correct Answer Zero accident, zero defect, zero breakdown
Your Answer Zero accident, zero defect, zero breakdown
True/False
Question Flow charts are drawn to identify deviations by observing actual & comparing with running process.
Correct Answer False
Your Answer False
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Select The Blank
Question Seiketsu is to ensure that ________ of first three 'S' i.e. Seiri, Seiton & Seiso.
Correct Answer Implementation
Your Answer Implementation
True/False
Question Benefits of DWN is faster response to customer needs.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Recording of the entire setup operators focusing on hand, eye and body movements of the person doing the setting is done through :-
Correct Answer Video recording
Your Answer Video recording
Multiple Choice Multiple Answer
Question During SMED implementation, primary study consists of :-
Correct Answer Equipment analysis , Setup change analysis , Preparation items (storage place , method) analysis
Your Answer Equipment analysis , Setup change analysis , Preparation items (storage place , method) analysis
Select The Blank
Question Ideally the histogram will have a symmetrical ( i.e. also called as bell) shape tapering away on both sides from ________ value.
Correct Answer Average
Your Answer Average
Select The Blank
Question ________ is the critical element of TQM.
Correct Answer Focus on customer
Your Answer Focus on customer
Multiple Choice Multiple Answer
Question Role of champions are :-
Correct Answer Approve six sigma projects , Remove road block in the path of six sigma implementation , Monitor progress of six sigma projects
Your Answer Approve six sigma projects , Remove road block in the path of six sigma implementation , Monitor progress of six sigma projects
Multiple Choice Multiple Answer
Question For 'Control on PPM and rework level;, checking points' will be :-
Correct Answer PPM level , Initiate corrective actions on rejection/rework , Initiate preventive action on rejection / rework
Your Answer PPM level , Initiate corrective actions on rejection/rework , Initiate preventive action on rejection / rework
Multiple Choice Single Answer
Question POP is :-
Correct Answer Process Oriented Management
Your Answer Process Oriented Management
True/False
Question TQM improves the quality by improving processes.
Correct Answer True
Your Answer True
True/False
Question Review is important step in problem solving.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question After finding out the solution & working on it, the equally important job is :-
Correct Answer Prepare for the presentation of your work , Explain the progress by presentation to steering committee , Convince committee for financial help for running the project
Your Answer Prepare for the presentation of your work , Explain the progress by presentation to steering committee , Convince committee for financial help for running the project
Match The Following
Question Correct Answer Your Answer
In scatter diagram, the strength of relationship can be determined By "correlation coefficient" By "correlation coefficient"
The scatter diagram provides the technique to establish The possible relationship between a pair of variables The possible relationship between a pair of variables
The scatter diagram displays The pair of data as a cloud of points The pair of data as a cloud of points
The scatter is also known as Correlation diagram Correlation diagram
True/False
Question In single card kanban system production greater than quantity withdrawn is permitted.
Correct Answer False
Your Answer False
Select The Blank
Question ________ is the root cause of the problems.
Correct Answer Variation
Your Answer Variation
Multiple Choice Single Answer
Question While assessing the current status during problem solving Go to Gamba and look at gembustu is :-
Correct Answer Essential
Your Answer Essential depends upon situation
Multiple Choice Multiple Answer
Question In absence of P-kanban the workman may :-
Correct Answer Carry out machine clean up , Work on improvement project. , Receive training
Your Answer Carry out machine clean up , Work on improvement project.
Multiple Choice Single Answer
Question The concept of quality circle was mooted by :-
Correct Answer Prof. Kaoishikawa
Your Answer Prof. Kaoishikawa
Select The Blank
Question ________ helps to generate creative ideas .
Correct Answer Brainstorming
Your Answer Brainstorming
Multiple Choice Single Answer
Question For small batch quality production, number of setups :-
Correct Answer Increases
Your Answer Increases
True/False
Question Process capability refers to ability of the process to meet the design specification for a product or a service.
Correct Answer True
Your Answer True
True/False
Question Kaizen looks at process as a part of quality & quantity as a part of process
Correct Answer False
Your Answer True
Select The Blank
Question ________ participants in monthly meeting(MRM)
Correct Answer GM, operation heads, corporate functional heads
Your Answer Department heads & supervisors
Multiple Choice Multiple Answer
Question Examples of Muda of defects are :-
Correct Answer Customer complaints , Poor material yield , Rejection and rework
Your Answer Customer complaints , Poor material yield , Rejection and rework
Multiple Choice Single Answer
Question Vilfredo Pareto had discovered a universal law as :-
Correct Answer "around 20% of the activity causes 80% of the effect"
Your Answer "around 20% of the activity causes 80% of the effect"
Multiple Choice Multiple Answer
Question Benefits from the standardized containers are
Correct Answer Minimization of transit damages , Ease in verification of quantity of parts , Automatic signal to supplier to replenish stock
Your Answer Minimization of transit damages , Ease in verification of quantity of parts , Automatic signal to supplier to replenish stock
True/False
Question TQM organizations also harness the goodwill and interest of the family members of the employees.
Correct Answer True
Your Answer True
Select The Blank
Question Technique involved in listing of setup task, establishing technological relationship between tasks, drawing arrow diagram is called as ________.
Correct Answer Network diagram
Your Answer Flow chart
Multiple Choice Multiple Answer
Question Kanban System may be :-
Correct Answer Single card kanban system , Double card kanban system
Your Answer Single card kanban system , Double card kanban system
Multiple Choice Single Answer
Question Bulk production, to reduce setup time is an example of :-
Correct Answer Over production
Your Answer Machine utilization
Multiple Choice Single Answer
Question SWOT analysis is an important step in :-
Correct Answer Deciding what to benchmark
Your Answer Deciding what to benchmark
Multiple Choice Multiple Answer
Question Remedial actions for error of misunderstanding is :-
Correct Answer Training , Checking in advance , Standardizing work procedures
Your Answer Training , Checking in advance , Standardizing work procedures
Select The Blank
Question ________ is a must in meeting of quality circles.
Correct Answer Brainstorming
Your Answer Brainstorming
Multiple Choice Single Answer
Question The Steering committee as apex body should be :-
Correct Answer Only one for all the groups in organization
Your Answer Only one for all the groups in organization
Multiple Choice Single Answer
Question Muda of transport can be eliminated significantly by :-
Correct Answer Self inspection by suppliers & operators
Your Answer Self inspection by suppliers & operators
Select The Blank
Question A histogram is a graphical display of distribution of measurements & reveals the amounts of ________ within the process.
Correct Answer Variation
Your Answer Variation
Multiple Choice Single Answer
Question Statistical process control is application of statistical technique to control :-
Correct Answer Process
Your Answer Process
Multiple Choice Single Answer
Question In India quality circle was first launched by :-
Correct Answer Hyderabad unit of BHEL
Your Answer Hyderabad unit of BHEL
True/False
Question A control chart is a chart with UCL & LCL placed at 6 Sigma distance on either side of the process average.
Correct Answer False
Your Answer False
True/False
Question Control limits of control charts should be revised from time to time as additional data is accumulated.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question Examples of Muda of motion are :-
Correct Answer Lifting objects , Walking to reach object , Searching for object
Your Answer Lifting objects , Walking to reach object , Searching for object
True/False
Question Kanban signals are required when assembly work, subassembly work and manufacturing at parts is carried out at different locations.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question Six sigma organization consists of :-
Correct Answer Champions , Black Belts , Green Belts
Your Answer Champions , Black Belts , Green Belts
Match The Following
Question Correct Answer Your Answer
LCLnp n p - 3 ( sq.root( n p( 1- p ))) n p - 3 ( sq.root( n p( 1- p )))
UCLp p + 3 ( sq.root( p ( 1 - p ) / n )) p + 3 ( sq.root( p ( 1 - p ) / n ))
LCLp p - 3 ( sq.root( p ( 1- p ) / n)) p - 3 ( sq.root( p ( 1- p ) / n))
UCLnp n p + 3 ( sq.root( n p ( 1- p ))) n p + 3 ( sq.root( n p ( 1- p )))
Multiple Choice Multiple Answer
Question Product benchmarking requires, comparison of product :-
Correct Answer Performance , Features , Cost
Your Answer Performance , Features , Cost
Select The Blank
Question JIT helps to ________ the waste in the purchasing process.
Correct Answer Eliminates
Your Answer Eliminates
Select The Blank
Question Poka Yoke is ________.
Correct Answer Simple technique
Your Answer Simple technique
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Select The Blank
Question Inspection activity for semi finished & finished component should be ________ to reduce muda of transport .
Correct Answer Decentralized
Your Answer Carry out in QA department
True/False
Question Concept of six sigma is not applicable for non manufacturing sectors.
Correct Answer False
Your Answer False
Multiple Choice Multiple Answer
Question Few main steps to construct a Histogram after deciding classes, class width & class boundaries are :-
Correct Answer Compute mid-point of the class (cell) & fill up the tally sheet determining the cell or class into which each value falls , Count the tally marks i.e. frequency in each class & construct a histogram by plotting a bar graph for each class , Analyze & conclude whether process is is meeting the requirement or not & take connective actions if needed.
Your Answer Compute mid-point of the class (cell) & fill up the tally sheet determining the cell or class into which each value falls , Count the tally marks i.e. frequency in each class & construct a histogram by plotting a bar graph for each class , Analyze & conclude whether process is is meeting the requirement or not & take connective actions if needed.
Multiple Choice Single Answer
Question A drive for people involved should start with the :-
Correct Answer Study of staff attitudes
Your Answer Staff empowerment
Multiple Choice Single Answer
Question Poka-yoke for employee not performing work as per established method is :-
Correct Answer Implement work standard
Your Answer Implement work standard
Multiple Choice Multiple Answer
Question Implementation of TPM in Indian industries is difficult due to :-
Correct Answer Lack of knowledge of the TPM , Resistance to change , Fear to loss of job
Your Answer Lack of knowledge of the TPM , Resistance to change , Fear to loss of job
Multiple Choice Single Answer
Question Identifying key preventive operational functions and comparing these operational functions within the firm's own division & branches comes under :-
Correct Answer Internal benchmarking
Your Answer Functional benchmarking
True/False
Question "Display of safety posture & slogans" is an essential step of TPM.
Correct Answer False
Your Answer True
Multiple Choice Single Answer
Question Errors by armatures is :-
Correct Answer Lack of experience
Your Answer Lack of experience
Multiple Choice Multiple Answer
Question The purpose of Shitsuke is especially for :-
Correct Answer Maintaining the 4-S consistently , Develop discipline attitude in everyone , Any day throughout the year sustain the discipline
Your Answer Maintaining the 4-S consistently , Develop discipline attitude in everyone , Any day throughout the year sustain the discipline
True/False
Question Change of job titles can help to raise employee's morale.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question Few steps to construct a flow chart are :-
Correct Answer Identify steps in the process & construct a draft of the flowchart , Review the draft & connect the changes as per review & name it & put the data & use it as 'Record' , Decide on the objective of flowchart & define boundaries of the process
Your Answer Decide on the objective of flowchart & define boundaries of the process , Identify steps in the process & construct a draft of the flowchart , Review the draft & connect the changes as per review & name it & put the data & use it as 'Record'
Select The Blank
Question In scatter diagram "________" relationship is said to exist when value of 'y' decreases as the value of 'x' increases.
Correct Answer Strong negative
Your Answer Strong negative
Multiple Choice Single Answer
Question Whatever you are doing you can do better by :-
Correct Answer Kaizen
Your Answer Kaizen
Multiple Choice Single Answer
Question Frequencies, values, tabulated in the frequency table, can be represented pictorially in the form of bar graph & this graph of frequency is called as :-
Correct Answer Histogram
Your Answer Histogram
True/False
Question Exercise to identify MURA, MUDA & MURI is not helpful to identify problems.
Correct Answer False
Your Answer False
Select The Blank
Question Kaizen projects are managed by ________
Correct Answer Cross functional team
Your Answer Management
Multiple Choice Single Answer
Question Number of Kaizen projects suggested and implemented is checking point for :-
Correct Answer Continual Improvement
Your Answer Continual Improvement
Match The Following
Question Correct Answer Your Answer
Flow chart are drawn to effect improvement in the process by Identifying non-value added activities Providing a documented description of the tasks involved
Flow chart are drawn to document a process by charting the tasks performed & the sequence in which tasks are performed Steps in a process by pictorial representation
Flow chart are prepared to enhance the employees understanding of the process by Indicating interrelationship within process charting the tasks performed & the sequence in which tasks are performed
Flow charts are drawn to identify deviations by Observing actual & comparing with documented process Indicating interrelationship within process
Multiple Choice Single Answer
Question Quality is the responsibility of :-
Correct Answer Everyone in the organization
Your Answer Everyone in the organization
Select The Blank
Question ________is serve as a stepping stone to TQM
Correct Answer ISO-9000 quality standard
Your Answer ISO-9000 quality standard
True/False
Question Generally time interval should be proportional to the average frequency of out of control conditions.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question Advantages of JIT :-
Correct Answer Reduce inventory , Lower per unit cost , Reduce incoming inspection
Your Answer Reduce inventory , Lower per unit cost
Multiple Choice Multiple Answer
Question Flow chart is prepared when :-
Correct Answer Defining the problem , Trying to know the activities involved in the process , Identifying the root causes
Your Answer Defining the problem , Trying to know the activities involved in the process , Identifying the root causes
Multiple Choice Single Answer
Question Difference between the specification limits is called as :-
Correct Answer Design tolerance
Your Answer Design tolerance
Match The Following
Question Correct Answer Your Answer
Productivity performance measurement Turnover employee Turnover employee
Financial performance measurement Sales of the months Sales of the months
Customer satisfaction measurement Customer complaints per period Customer complaints per period
Staff attitude measurement Employee satisfaction index Employee satisfaction index
True/False
Question Shitsuke is most difficult out of all 5-S because it means to sustain all the first 4-S throughout the year.
Correct Answer True
Your Answer True
Select The Blank
Question Graphs convey a situation more ________ than summary of data or figures.
Correct Answer Effectively & clearly
Your Answer Effectively & clearly
True/False
Question Key element of JIT is continuous improvement.
Correct Answer True
Your Answer False
Select The Blank
Question Histogram is a diagrammatic presentation of the ________ distribution of characteristics such as strength, diameter, etc.
Correct Answer Frequency
Your Answer Frequency
Multiple Choice Single Answer
Question Control chart indicates :-
Correct Answer Trend of process
Your Answer Control on process
Select The Blank
Question Shitsuke means ________ all the previous 4-S throughout the month/year.
Correct Answer Sustaining
Your Answer Sustaining
Multiple Choice Single Answer
Question Competitive benchmarking is usually conducted :-
Correct Answer Through third party research
Your Answer Through third party research
Multiple Choice Single Answer
Question Ishikawa diagram is also known as :-
Correct Answer Cause & effect diagram
Your Answer Cause & effect diagram
Select The Blank
Question JIT helps to ________ the waste in the purchasing process.
Correct Answer Eliminates
Your Answer Eliminates
Select The Blank
Question To assess effectiveness of training ________ is essential.
Correct Answer Evaluation
Your Answer Evaluation
Multiple Choice Multiple Answer
Question Types of meetings held in DWM are :-
Correct Answer Daily PDCA meeting , Weekly PDCA meeting , Monthly PDCA meeting
Your Answer Daily PDCA meeting , Weekly PDCA meeting , Monthly PDCA meeting
Select The Blank
Question A 'Radar chart' is a combination of circle & ________ Graph.
Correct Answer Line
Your Answer Line
True/False
Question Kaizen looks at process as a part of quality & quantity as a part of process
Correct Answer False
Your Answer True
True/False
Question TQM improves manufacturing as well as clerical activities.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question "Cause & effect" diagram was developed by :-
Correct Answer DR.Kaoru Ishikawa
Your Answer DR.Kaoru Ishikawa
Multiple Choice Single Answer
Question Japanese concept of good house keeping is for:
Correct Answer Good environment for quality products
Your Answer To reduce waste
Select The Blank
Question The process capability of the process =________(where sigma is the standard deviation of the population / lot.
Correct Answer 6 sigma
Your Answer 6 sigma
Multiple Choice Multiple Answer
Question 3M' is world class benchmarking ' candidates in the field of :-
Correct Answer Product development , Technology transfer , Environmental Management
Your Answer Product development , Environmental Management , Billing & collection
Multiple Choice Multiple Answer
Question Poka-Yoke devices which can help to avoid the defects are :-
Correct Answer Guide pins , Limit switches , Checklist
Your Answer Guide pins , Limit switches , Checklist
True/False
Question Gap analysis for production & dispatches is discussed in monthly meeting.
Correct Answer False
Your Answer False
Multiple Choice Multiple Answer
Question Actions to be taken to help staff to develop their careers are :-
Correct Answer Job rotation exercise , Preference to be given to employees during job vacancies , Encourage employees to improve their qualification
No comments:
Post a Comment