Search the Assignments and Papers Here...

Techniques for Operations Efficiency - A1

Multiple Choice Multiple Answer
Question
TQM can never flourish if the staff are:-
Correct Answer
Scared of their bosses , Worried about losing jobs , Afraid of being reprimanded if there are mistakes
Your Answer
Scared of their bosses , Worried about losing jobs , Afraid of being reprimanded if there are mistakes

Multiple Choice Single Answer
Question
Quality problem solving tool is used to :-
Correct Answer
Improve quality
Your Answer
Improve quality

Multiple Choice Single Answer
Question
The concept of quality circle was mooted by :-
Correct Answer
Prof. Kaoishikawa
Your Answer
Prof. Kaoishikawa

Match The Following
Question
Correct Answer
Your Answer
SMED
Setup time reduction
Setup time reduction
5 'S
Cleanliness
Total productive maintenance
Muda elimination
Waste elimination
Waste elimination
Poka-Yoke
Error proofing
Error proofing

Multiple Choice Single Answer
Question
Allowing worker's to stop machine / assembly line if they believe that product quality is below standard' is an example of :-
Correct Answer
Empowerment
Your Answer
Involvement

Select The Blank
Question
Kaizen is ________ supported process.
Correct Answer
Management
Your Answer
Workmen

Select The Blank
Question
Ratio of ________ to the number of pieces inspected is called fraction defectives.
Correct Answer
Number of item rejected
Your Answer
Number of item rejected

Multiple Choice Single Answer
Question
Histogram always indicates :-
Correct Answer
Only height
Your Answer
Percentage defect

Multiple Choice Single Answer
Question
List of customers, to carry out parato analysis to identify customers who gives business includes :-
Correct Answer
Present & past customers
Your Answer
Present & past customers

Multiple Choice Single Answer
Question
Implication of Quality problem is:-
Correct Answer
Gap in performance
Your Answer
Gap in performance

Multiple Choice Multiple Answer
Question
Steps to six sigma process consists of :-
Correct Answer
Identify the work you do , Identify your customers , Map the process
Your Answer
Identify the work you do , Identify your customers , Map the process

Multiple Choice Single Answer
Question
From scatter diagram the strength of relationship between two variables or associated set of data can be inferred from the examination of the shape of :-
Correct Answer
Cloud
Your Answer
Cloud

True/False
Question
Non-availability of files /document in time is a problem to be addressed by office TPM.
Correct Answer
True
Your Answer
True

Select The Blank
Question
________ used to detect drop in air pressure.
Correct Answer
Buzzers / alarms
Your Answer
Locators

Multiple Choice Single Answer
Question
TQM is a way to improve quality of product and service :-
Correct Answer
Continuously
Your Answer
Continuously

Multiple Choice Multiple Answer
Question
The aim of education & training under TPM is :-
Correct Answer
To develop abilities to respond quickly to abnormalities , To develop abilities to discover analyze malfunction
Your Answer
To develop abilities to respond quickly to abnormalities , To develop abilities to discover analyze malfunction , To have multiskilled employees in all departments

Match The Following
Question
Correct Answer
Your Answer
In scatter diagram, the strength of relationship can be determined
By "correlation coefficient"
By "correlation coefficient"
The scatter diagram provides the technique to establish
The possible relationship between a pair of variables
The possible relationship between a pair of variables
The scatter diagram displays
The pair of data as a cloud of points
The pair of data as a cloud of points
The scatter is also known as
Correlation diagram
Correlation diagram

True/False
Question
Flow chart is pictorial representation of the steps in production control.
Correct Answer
False
Your Answer
True

Multiple Choice Single Answer
Question
Pareto's analysis underlines & operates philosophy of :-
Correct Answer
Vital few = trivial many
Your Answer
Vital few = trivial many

Multiple Choice Single Answer
Question
Pareto diagram always indicate magnitude of :-
Correct Answer
Defect
Your Answer
Influence of defect

True/False
Question
By cutting the cost of quality, profitability decreases.
Correct Answer
False
Your Answer
False

Multiple Choice Single Answer
Question
Check sheet is easy to use because it is :-
Correct Answer
Simplest tool
Your Answer
Simplest tool

True/False
Question
The flow charts are prepared to enhance the employees understanding of the process by indicating interrelationship within the process.
Correct Answer
True
Your Answer
True

Multiple Choice Single Answer
Question
Abnormal variations can occur if :-
Correct Answer
There are assignable causes
Your Answer
There are assignable causes

Multiple Choice Multiple Answer
Question
Types of Poka-Yoke are :-
Correct Answer
Prevention type Poka-Yoke , Detection type Poka-Yoke
Your Answer
Prevention type Poka-Yoke , Detection type Poka-Yoke , Standards type Poka-Yoke

True/False
Question
Control limits of control charts should be revised from time to time as additional data is accumulated.
Correct Answer
True
Your Answer
True

Select The Blank
Question
Kaizen is an excellent method to involve ________ to unearth & eliminate hidden waste.
Correct Answer
Employees
Your Answer
Employers

Multiple Choice Multiple Answer
Question
To reduce Muda of transport, techniques used are :-
Correct Answer
Cellular layout , Method study , 5 'S
Your Answer
Cellular layout , Method study , 5 'S

Select The Blank
Question
Cp for six sigma process is ________
Correct Answer
2
Your Answer
2

Select The Blank
Question
________ participants in monthly meeting(MRM)
Correct Answer
GM, operation heads, corporate functional heads
Your Answer
Department heads & supervisors

True/False
Question
Processing cost of a product is mainly decided by conversion process.
Correct Answer
True
Your Answer
True

Select The Blank
Question
Production in last shift & production plan for next shift is discussed during ________.
Correct Answer
Shift beginning & shift end/change meeting
Your Answer
Shift beginning & shift end/change meeting

Multiple Choice Multiple Answer
Question
Material Supply on DSL basis helps :-
Correct Answer
To eliminate handling , To reduce transporting , To reduce inspection
Your Answer
To eliminate handling , To reduce transporting , To reduce inspection

True/False
Question
Inadequate maintenance of machine leads to muda of defects
Correct Answer
True
Your Answer
True

True/False
Question
Most of the external setups are treated as internal setup.
Correct Answer
True
Your Answer
False

Multiple Choice Multiple Answer
Question
Benefits from SMED are :-
Correct Answer
Reduce work in process , Better average daily production , Increase capacity
Your Answer
Reduce work in process , Better average daily production , Increase capacity

Multiple Choice Multiple Answer
Question
Typical examples of process benchmark are :-
Correct Answer
Procurement procedures , Budgeting , Recruitment
Your Answer
Procurement procedures , Budgeting , Recruitment

True/False
Question
Low level of delegation is an example of muda in office.
Correct Answer
True
Your Answer
False

Multiple Choice Multiple Answer
Question
Histograms are useful to :-
Correct Answer
Measure the current pattern & extent of variation , Assess current conformance to specification & scope of improvement , Determine whether or not the process is in the state of control
Your Answer
Measure the current pattern & extent of variation , Assess current conformance to specification & scope of improvement , Determine whether or not the process is in the state of control

Multiple Choice Multiple Answer
Question
While preparing scatter diagram following precautions are to be taken :-
Correct Answer
Data should be properly stratified & should be collected for full range , Scale selected should be right to avoid wrong conclusions , Data should be free from bias or undue importance
Your Answer
Data should be properly stratified & should be collected for full range , Scale selected should be right to avoid wrong conclusions , Data should be free from bias or undue importance

Multiple Choice Single Answer
Question
Through continuous improvement in the process & procedures, kobetsu-kaizen is continuously improve utilization of :-
Correct Answer
Worker, equipment & material
Your Answer
Workers & materials

True/False
Question
Every department should make their own rules of standardization.
Correct Answer
False
Your Answer
False

Multiple Choice Single Answer
Question
Quality circle should consist adequate experienced members between :-
Correct Answer
8 to 10
Your Answer
8 to 10

Multiple Choice Single Answer
Question
Number of kaizen in Group kaizen categories are :-
Correct Answer
Two to three per year
Your Answer
As many as management decides

Select The Blank
Question
Flow chart helps to provide clarity of the ________ without visiting actual spot.
Correct Answer
Process
Your Answer
Process

Multiple Choice Single Answer
Question
Gap in performance = Ideal situation minus :-
Correct Answer
Current situation
Your Answer
Current situation

Select The Blank
Question
Seminar talks and video show are organized to introduce TPM concept to ________
Correct Answer
General employees
Your Answer
General employees


True/False
Question
Process capability index Cp is a measure of capability of the process to meet the specification limits.
Correct Answer
True
Your Answer
True

Select The Blank
Question
Basic objective of control chart is to ________ the variation due to chance & assignable cause.
Correct Answer
Separate out
Your Answer
Eliminate

Multiple Choice Single Answer
Question
Quality problem solving tool is used to :-
Correct Answer
Improve quality
Your Answer
Improve quality

Multiple Choice Single Answer
Question
Kaizen process is built on PDCA cycle, where P represents :-
Correct Answer
PLAN
Your Answer
PLAN

Multiple Choice Single Answer
Question
One Green Belt may head a team of :-
Correct Answer
20 employees
Your Answer
20 employees

Select The Blank
Question
Flow chart helps to dissect a process for better understanding & ________ of process.
Correct Answer
Analysis
Your Answer
Analysis

Select The Blank
Question
________ analysis is a central tenet of Kaizen.
Correct Answer
Root cause
Your Answer
Root cause

True/False
Question
Defects are not the consequences of human errors.
Correct Answer
False
Your Answer
False

Multiple Choice Multiple Answer
Question
Benefits of Daily work management are :-
Correct Answer
Improve resource utilization through gap analysis , Faster response to customer needs , Better communication
Your Answer
Improve resource utilization through gap analysis , Faster response to customer needs , Better communication

Select The Blank
Question
Due to SMED, ________ time cuts down.
Correct Answer
Waiting
Your Answer
Waiting

Multiple Choice Multiple Answer
Question
Limitation of quality circles are :-
Correct Answer
Problems headed by worker group must be simple & within their limit , Unions in India are reluctant , Management is also not open for union
Your Answer
Problems headed by worker group must be simple & within their limit , Unions in India are reluctant , Management is also not open for union

Multiple Choice Single Answer
Question
In traditional manufacturing line :-
Correct Answer
Cycle time is more
Your Answer
Cycle time is more

Select The Blank
Question
Each quality characteristic has permitted variation & is equal to ________.
Correct Answer
USL - LSL
Your Answer
USL - LSL

Multiple Choice Single Answer
Question
Assignable causes :-
Correct Answer
Can be eliminated
Your Answer
Can be eliminated

Multiple Choice Multiple Answer
Question
After finding out the solution & working on it, the equally important job is :-
Correct Answer
Prepare for the presentation of your work , Explain the progress by presentation to steering committee , Convince committee for financial help for running the project
Your Answer
Prepare for the presentation of your work , Explain the progress by presentation to steering committee , Convince committee for your next project

True/False
Question
Gap analysis for production & dispatches is discussed in monthly meeting.
Correct Answer
False
Your Answer
False

True/False
Question
Most of the external setups are treated as internal setup.
Correct Answer
True
Your Answer
False

Multiple Choice Multiple Answer
Question
Few main steps to construct a Histogram after deciding classes, class width & class boundaries are :-
Correct Answer
Compute mid-point of the class (cell) & fill up the tally sheet determining the cell or class into which each value falls , Count the tally marks i.e. frequency in each class & construct a histogram by plotting a bar graph for each class , Analyze & conclude whether process is is meeting the requirement or not & take connective actions if needed.
Your Answer
Compute mid-point of the class (cell) & fill up the tally sheet determining the cell or class into which each value falls , Count the tally marks i.e. frequency in each class & construct a histogram by plotting a bar graph for each class , Analyze & conclude whether process is is meeting the requirement or not & take connective actions if needed.

Multiple Choice Single Answer
Question
Pricing in JIT purchasing is done by
Correct Answer
Buyer and seller together
Your Answer
Buyer and seller together

Multiple Choice Single Answer
Question
The first step in setup time operation studies is to time each setup, took, review task & :-
Correct Answer
Separate internal & external setup task
Your Answer
Separate internal & external setup task

Select The Blank
Question
Poka Yoke is ________.
Correct Answer
Simple technique
Your Answer
Simple technique

Select The Blank
Question
To find out root cause ________used
Correct Answer
Why-why Technique
Your Answer
Why-why Technique

Multiple Choice Multiple Answer
Question
Steps to six sigma process consists of :-
Correct Answer
Identify the work you do , Identify your customers , Map the process
Your Answer
Identify the work you do , Identify your customers , Map the process

True/False
Question
Daily work management can also be extended to non manufacturing areas like procurement, QA, HRD etc.
Correct Answer
True
Your Answer
True

Select The Blank
Question
________ % of quality problems are due to individual errors.
Correct Answer
15
Your Answer
15

Multiple Choice Single Answer
Question
Ishikawa diagram is also known as :-
Correct Answer
Cause & effect diagram
Your Answer
Cause & effect diagram

True/False
Question
Implementation of all 8 TPM pillar activities must start at a time .
Correct Answer
False
Your Answer
True

Match The Following
Question
Correct Answer
Your Answer
Review your efforts & success achieved
Check
Check
Act about the causes found out
Do
Do
Collect the initial data for the problem
Plan
Plan
Actions further after reviewing the progress
Act
Act

Select The Blank
Question
Technique involved in listing of setup task, establishing technological relationship between tasks, drawing arrow diagram is called as ________.
Correct Answer
Network diagram
Your Answer
Network diagram

True/False
Question
U-Line layout is better than straight lime layout.
Correct Answer
True
Your Answer
True

Select The Blank
Question
Poka-Yoke devices under category use ________ to distinguish between similar parts which may be assembled in wrong position.
Correct Answer
Color coding
Your Answer
Color coding

Multiple Choice Multiple Answer
Question
Benefits from the standardized containers are
Correct Answer
Minimization of transit damages , Ease in verification of quantity of parts , Automatic signal to supplier to replenish stock
Your Answer
Minimization of transit damages , Ease in verification of quantity of parts , Automatic signal to supplier to replenish stock

Multiple Choice Single Answer
Question
Number of kaizen in Group kaizen categories are :-
Correct Answer
Two to three per year
Your Answer
Two to three per year

True/False
Question
Graph is a tabulated representation of the data which is easily understandable at a glance.
Correct Answer
False
Your Answer
False

Multiple Choice Single Answer
Question
Time required to study blue prints / drawing is included in :-
Correct Answer
Setup time
Your Answer
Setup time

Multiple Choice Multiple Answer
Question
Actions that can be thought for the process having process capability is higher than specification tolerance are
Correct Answer
100 % inspection is required , Reduce variability , Possibility of squeezing tolerances
Your Answer
100 % inspection is required , Reduce variability

Multiple Choice Single Answer
Question
Withdrawal kanban is presented by :-
Correct Answer
C- kanban
Your Answer
C- kanban
Multiple Choice Multiple Answer
Question
The aim of education & training under TPM is :-
Correct Answer
To develop abilities to respond quickly to abnormalities , To develop abilities to discover analyze malfunction
Your Answer
To develop abilities to respond quickly to abnormalities , To develop abilities to discover analyze malfunction , To have multiskilled employees in all departments

Multiple Choice Multiple Answer
Question
To draw control charts, sample must be representative of homogeneous segment of production for which :-
Correct Answer
The items of the sample should be from the same machine setting , The items should be of the same batch , Items should be made from the same raw material batch
Your Answer
The items of the sample should be from the same machine setting , The items should be of the same batch , Items should be made from the same raw material batch

Select The Blank
Question
To eliminate muda of processing, ________ exercise is essential.
Correct Answer
ECRS
Your Answer
MOST

Multiple Choice Multiple Answer
Question
Cleaning your own area/equipments gives benefits of :-
Correct Answer
You know your self how to avoid dust , When you touch while cleaning you may find a fault , Saving of further failure due to dust
Your Answer
You know your self how to avoid dust , When you touch while cleaning you may find a fault , Saving of further failure due to dust

True/False
Question
Performance benchmarking does not involves comparison of financial ratios at the aggregate level.
Correct Answer
False
Your Answer
False

Multiple Choice Multiple Answer
Question
Material Supply on DSL basis helps :-
Correct Answer
To eliminate handling , To reduce transporting , To reduce inspection
Your Answer
To eliminate handling , To reduce transporting , To reduce inspection

Multiple Choice Single Answer
Question
Chance causes :-
Correct Answer
Cannot be identified
Your Answer
Cannot be identified

Multiple Choice Multiple Answer
Question
The alternate meaning of seiso is
Correct Answer
Sanities , Cleanup , Dust free / scrab
Your Answer
Sanities , Cleanup , Dust free / scrab

Multiple Choice Single Answer
Question
Production kanban is presented by :-
Correct Answer
P-kanban
Your Answer
P-kanban



True/False
Question
Without review PDCA cycle not completed.
Correct Answer
True
Your Answer
True

Select The Blank
Question
________ is the critical element of TQM.
Correct Answer
Focus on customer
Your Answer
Focus on customer

Select The Blank
Question
Quality improvement team consists of departmental head with a chairperson who has easy access to the ________.
Correct Answer
Top management
Your Answer
Top management

Multiple Choice Single Answer
Question
Abnormal variations can occur if :-
Correct Answer
There are assignable causes
Your Answer
There are chance causes

Multiple Choice Single Answer
Question
To avoid short receipt of items to customers, provide the dispatch clerk with :
Correct Answer
The check list for verification
Your Answer
The check list for verification

Match The Following
Question
Correct Answer
Your Answer
Cleanliness
5 'S
5 'S
Withdrawal Kanban
C-Kanban
C-Kanban
Production kanban
P-Kanban
P-Kanban
Waste elimination
Muda elimination
Muda elimination

Multiple Choice Multiple Answer
Question
If 'Annual saving in procurement expenses is managing point', then checking points will be :-
Correct Answer
Price revision , Credit period , Transport expenses
Your Answer
Price revision , Credit period , Transport expenses

Multiple Choice Multiple Answer
Question
To draw control charts, sample must be representative of homogeneous segment of production for which :-
Correct Answer
The items of the sample should be from the same machine setting , The items should be of the same batch , Items should be made from the same raw material batch
Your Answer
The items of the sample should be from the same machine setting , The items should be of the same batch , Items should be made from the same raw material batch

Multiple Choice Multiple Answer
Question
Kanban System may be :-
Correct Answer
Single card kanban system , Double card kanban system
Your Answer
Single card kanban system , Double card kanban system

Multiple Choice Multiple Answer
Question
Benefits from the standardized containers are
Correct Answer
Minimization of transit damages , Ease in verification of quantity of parts , Automatic signal to supplier to replenish stock
Your Answer
Minimization of transit damages , Ease in verification of quantity of parts , Automatic signal to supplier to replenish stock

Select The Blank
Question
A control chart to exhibit counted data on number of defect is called ________.
Correct Answer
c-chart
Your Answer
c-chart

Multiple Choice Single Answer
Question
A control chart is a chart with UCL & LCL placed at :-
Correct Answer
3 Sigma distance on either side of the process average
Your Answer
3 Sigma distance on either side of the process average

True/False
Question
By cutting the cost of quality, profitability decreases.
Correct Answer
False
Your Answer
True

Multiple Choice Multiple Answer
Question
Key principles of TQM :-
Correct Answer
Continuous improvement , People involvement , Cost of quality
Your Answer
Continuous improvement , People involvement , Cost of quality

Multiple Choice Multiple Answer
Question
Flow chart is required :-
Correct Answer
When trying to improve the process , At the time of review of the process , To understand steps in a process by pictorial presentation
Your Answer
When trying to improve the process , At the time of review of the process

Multiple Choice Single Answer
Question
Pricing in JIT purchasing is done by
Correct Answer
Buyer and seller together
Your Answer
Buyer and seller together

True/False
Question
Fishbone analysis is used both in analysis & planning.
Correct Answer
True
Your Answer
True

Select The Blank
Question
Graphs convey a situation more ________ than summary of data or figures.
Correct Answer
Effectively & clearly
Your Answer
Effectively & clearly

Multiple Choice Single Answer
Question
Quality problem solving tool is used to :-
Correct Answer
Improve quality
Your Answer
Improve quality

Multiple Choice Multiple Answer
Question
Flow chart is prepared when :-
Correct Answer
Defining the problem , Trying to know the activities involved in the process , Identifying the root causes
Your Answer
Defining the problem , Trying to know the activities involved in the process , Identifying the root causes

Multiple Choice Single Answer
Question
Due to planned maintenance MTBF (mean time between failure)
Correct Answer
Increases
Your Answer
Increases

Select The Blank
Question
In PDCA cycle for benchmarking 'Identification of performance gap' is done in ________.
Correct Answer
Checking
Your Answer
Planning

Select The Blank
Question
Number of defects in an individual component, like gear, shaft, wheel etc can be monitored through ________ type of control chart.
Correct Answer
c-chart
Your Answer
c-chart

True/False
Question
Sample size for the construction of p-chart are larger than X bar-R chart.
Correct Answer
True
Your Answer
True

Multiple Choice Multiple Answer
Question
Few main steps to construct a Histogram after deciding classes, class width & class boundaries are :-
Correct Answer
Compute mid-point of the class (cell) & fill up the tally sheet determining the cell or class into which each value falls , Count the tally marks i.e. frequency in each class & construct a histogram by plotting a bar graph for each class , Analyze & conclude whether process is is meeting the requirement or not & take connective actions if needed.
Your Answer
Compute mid-point of the class (cell) & fill up the tally sheet determining the cell or class into which each value falls , Count the tally marks i.e. frequency in each class & construct a histogram by plotting a bar graph for each class , Analyze & conclude whether process is is meeting the requirement or not & take connective actions if needed.

Match The Following
Question
Correct Answer
Your Answer
Parato diagram always indicates
Magnitude of defects
Philosophy of 20% of the activity causes 80% of the effect
Parato analysis underlines & operates on
Philosophy of "vital few:trivial many"
Philosophy of "vital few:trivial many"
Parato analysis is technique of identifying vital causes by
Arranging data according to the descending order of their frequency of occurrence
Arranging data according to the descending order of their frequency of occurrence
Parato diagram is a Bar graph with height or value drawn by
Arranging data in descending order
Arranging data in descending order

True/False
Question
Presentation before steering committee must reveal teamwork efforts towards success.
Correct Answer
True
Your Answer
True

Select The Blank
Question
Technique involved in listing of setup task, establishing technological relationship between tasks, drawing arrow diagram is called as ________.
Correct Answer
Network diagram
Your Answer
Network diagram

Multiple Choice Multiple Answer
Question
Cleaning your own area/equipments gives benefits of :-
Correct Answer
You know your self how to avoid dust , When you touch while cleaning you may find a fault , Saving of further failure due to dust
Your Answer
When you touch while cleaning you may find a fault , Saving of further failure due to dust , Utilization of spare time

Multiple Choice Multiple Answer
Question
After choosing the problem area, to go ahead further what is required?
Correct Answer
Regular meeting plan to follow , Discuss on the root cause by brainstorming , Follow the Deming PDCA circle
Your Answer
Regular meeting plan to follow , Discuss on the root cause by brainstorming , Follow the Deming PDCA circle

True/False
Question
U-Line layout is better than straight lime layout.
Correct Answer
True
Your Answer
True

Multiple Choice Multiple Answer
Question
What are the steps in deciding the benchmarking partner?
Correct Answer
Decide level of benchmarking , List down a few prospective candidates of partnership , Collect information of short listed partners
Your Answer
List down a few prospective candidates of partnership , Collect information of short listed partners , Plan partner's site visit

Select The Blank
Question
5 S audit result is discussed in ________ meeting.
Correct Answer
Monthly
Your Answer
Monthly

True/False
Question
In P-chart, the value of P can never be negative.
Correct Answer
True
Your Answer
True

True/False
Question
Statistical limits are calculated from averages of samples, instead of a single sample of large size.
Correct Answer
True
Your Answer
True

Multiple Choice Single Answer
Question
Control chart is a graphical method of ascertaining / checking :-
Correct Answer
Stability of the process
Your Answer
Stability of the process

Select The Blank
Question
Histogram is a diagrammatic presentation of the ________ distribution of characteristics such as strength, diameter, etc.
Correct Answer
Frequency
Your Answer
Frequency

Multiple Choice Multiple Answer
Question
Few steps to construct a flow chart are :-
Correct Answer
Decide on the objective of flowchart & define boundaries of the process , Identify steps in the process & construct a draft of the flowchart , Review the draft & connect the changes as per review & name it & put the data & use it as 'Record'
Your Answer
Decide on the objective of flowchart & define boundaries of the process , Identify steps in the process & construct a draft of the flowchart , Review the draft & connect the changes as per review & name it & put the data & use it as 'Record'

Multiple Choice Single Answer
Question
Goal of six sigma is to improve customer satisfaction by :-
Correct Answer
Reducing gaps/defects
Your Answer
Reducing gaps/defects

Multiple Choice Single Answer
Question
Implication of Quality problem is:-
Correct Answer
Gap in performance
Your Answer
Gap in performance

True/False
Question
There is no upper limit for Cp.
Correct Answer
True
Your Answer
True

True/False
Question
5'S is not essential for office TPM
Correct Answer
False
Your Answer
False

Multiple Choice Single Answer
Question
Seiton means
Correct Answer
Code Numbers to item as well as racks & drawers
Your Answer
Putting things in racks & cupboards

Multiple Choice Single Answer
Question
Some quantity in stock of item, is desirable if :-
Correct Answer
Manufacturing lead time is more
Your Answer
Manufacturing lead time is less

Multiple Choice Single Answer
Question
What is to be done before selecting benchmarking partner?
Correct Answer
level of benchmarking is to be decided
Your Answer
level of benchmarking is to be decided

Multiple Choice Single Answer
Question
Empowerment means making best use of the firm's most valuable resource, namely:-
Correct Answer
Human
Your Answer
Human

Select The Blank
Question
Capability index Cp = ________
Correct Answer
Specification width/process width
Your Answer
Specification width/standard deviation



Select The Blank
Question
Kaizen projects are managed by ________
Correct Answer
Cross functional team
Your Answer
Management

Select The Blank
Question
In traditional purchasing ________ inventory is required.
Correct Answer
Plenty of
Your Answer
Plenty of

Multiple Choice Single Answer
Question
Seiton means
Correct Answer
Place for everything and everything on place
Your Answer
Place for everything and everything on place

Select The Blank
Question
CFT ( cross functional team ) consisting of ________
Correct Answer
Operators, supervisors from different departments
Your Answer
Operators, supervisors from different departments

True/False
Question
The flow charts are prepared to enhance the employees understanding of the process by indicating interrelationship within the process.
Correct Answer
True
Your Answer
True

Select The Blank
Question
Seiketsu is to ensure that ________ of first three 'S' i.e. Seiri, Seiton & Seiso.
Correct Answer
Implementation
Your Answer
Implementation

True/False
Question
Seiso means cleaning the workplace, is the responsibility of sweeper or cleaning person.
Correct Answer
False
Your Answer
False

Multiple Choice Multiple Answer
Question
Six sigma organization consists of :-
Correct Answer
Champions , Black Belts , Green Belts
Your Answer
Champions , Black Belts , Green Belts

Multiple Choice Multiple Answer
Question
Examples of Muda of motion are :-
Correct Answer
Lifting objects , Walking to reach object , Searching for object
Your Answer
Lifting objects , Walking to reach object , Searching for object

True/False
Question
Number of operation can change according to production requirement in U-Line arrangement.
Correct Answer
False
Your Answer
True

Multiple Choice Multiple Answer
Question
Benefits from SMED are :-
Correct Answer
Reduce work in process , Better average daily production , Increase capacity
Your Answer
Reduce work in process , Better average daily production , Increase capacity

Select The Blank
Question
Ratio of ________ to the number of pieces inspected is called fraction defectives.
Correct Answer
Number of item rejected
Your Answer
Number of item rejected

True/False
Question
Ideally the histogram will a bell shape tapering away on both sides from average value.
Correct Answer
True
Your Answer
False

Select The Blank
Question
Cost of quality may account for ________ % of portion of the company's turnover.
Correct Answer
20-30%
Your Answer
20-30%

Match The Following
Question
Correct Answer
Your Answer
Ideally the histogram will have a bell shape
Tapering away on the both sides from average value
Tapering away on the both sides from average value
Histogram is a graphical display of distribution of measurements and
Reveals the amount of variation within the process
Reveals the amount of variation within the process
Histogram is a diagrammatic presentation of
The frequency distribution of a characteristics
The frequency distribution of a characteristics
The shape of histogram can
Provide a clue about the quality of the lot
Provide a clue about the quality of the lot

Multiple Choice Multiple Answer
Question
Cpk =
Correct Answer
(x - USL)/3 sigma , (x - LSL)/3 sigma
Your Answer
(x - USL)/3 sigma , (x - LSL)/3 sigma

True/False
Question
A radar chart is combination of a circle & line graph
Correct Answer
True
Your Answer
True

True/False
Question
Control limits of control charts should be revised from time to time as additional data is accumulated.
Correct Answer
True
Your Answer
True

Multiple Choice Single Answer
Question
Rushing to complete a job is considered symptom of :-
Correct Answer
Poor planning
Your Answer
Poor planning

Select The Blank
Question
________ waste is probably the biggest waste in most of the organizations.
Correct Answer
Time
Your Answer
Time

True/False
Question
Inspection is poor method of assuring 100% quality.
Correct Answer
True
Your Answer
False

True/False
Question
Presentation of graphs in pictorial form of data collection are for easy understanding.
Correct Answer
True
Your Answer
True

Match The Following
Question
Correct Answer
Your Answer
Kanban
Pull system
Pull system
Work standards
Best way of doing job
Reducing breakdown of machines
TPM
Reducing breakdown of machines
Best way of doing job
JIT
Waste elimination
Waste elimination

Multiple Choice Multiple Answer
Question
Implementation of TPM in Indian industries is difficult due to :-
Correct Answer
Lack of knowledge of the TPM , Resistance to change , Fear to loss of job
Your Answer
Lack of knowledge of the TPM , Resistance to change , Fear to loss of job

Multiple Choice Multiple Answer
Question
Actions that can be thought for the process having process capability is smaller than specification tolerance are:-
Correct Answer
Reduction in inspection , Use of less precision machine , Possibility of squeezing tolerances
Your Answer
Use of less precision machine , Possibility of squeezing tolerances , Reduction in inspection

Multiple Choice Multiple Answer
Question
Role of champions are :-
Correct Answer
Approve six sigma projects , Remove road block in the path of six sigma implementation , Monitor progress of six sigma projects
Your Answer
Approve six sigma projects , Remove road block in the path of six sigma implementation , Monitor progress of six sigma projects

Multiple Choice Single Answer
Question
Poka-yoke for employee not performing work as per established method is :-
Correct Answer
Implement work standard
Your Answer
Implement work standard

True/False
Question
Inadequate maintenance of machine leads to muda of defects
Correct Answer
True
Your Answer
False

Select The Blank
Question
Histogram is a diagrammatic presentation of the ________ distribution of characteristics such as strength, diameter, etc.
Correct Answer
Frequency
Your Answer
Frequency

Multiple Choice Multiple Answer
Question
Types of meetings held in DWM are :-
Correct Answer
Daily PDCA meeting , Weekly PDCA meeting , Monthly PDCA meeting
Your Answer
Daily PDCA meeting , Weekly PDCA meeting , Monthly PDCA meeting

Select The Blank
Question
________ is responsible for effective implementation of action plan's under TPM.
Correct Answer
Steering committee
Your Answer
Maintenance department

Select The Blank
Question
________ is an effect due to the muda of defect.
Correct Answer
Wear & tear of parts while disassembling
Your Answer
Wear & tear of parts while disassembling

Multiple Choice Single Answer
Question
Participants of the groups for quality circles should be decided by :-
Correct Answer
Employees coming together by their own enthusiasm
Your Answer
Employees coming together by their own enthusiasm

Multiple Choice Single Answer
Question
Japanese concept of good house keeping is for:
Correct Answer
Good environment for quality products
Your Answer
Good environment for quality products

Select The Blank
Question
Japanese believe that when they are ________ they are cleaning there minds too.
Correct Answer
Cleaning
Your Answer
Cleaning

Multiple Choice Single Answer
Question
Initiative CA/PA for customer complaint is check point for :-
Correct Answer
Response to customer complaint
Your Answer
Response to customer complaint

Multiple Choice Multiple Answer
Question
Breakdown problem may be stratified by :-
Correct Answer
Sections , Machines , Type of breakdown (e.g mech. Or electrical)
Your Answer
Machines , Type of breakdown (e.g mech. Or electrical)

Multiple Choice Multiple Answer
Question
Customer contact staff need training in areas like :-
Correct Answer
Questioning skills , Listening skills , Telephone attending techniques
Your Answer
Questioning skills , Listening skills , Telephone attending techniques

Multiple Choice Single Answer
Question
To sustain the 5-S throughout the months best method is :-
Correct Answer
Start surprise internal audits
Your Answer
Declare prizes

Multiple Choice Single Answer
Question
Recording of the entire setup operators focusing on hand, eye and body movements of the person doing the setting is done through :-
Correct Answer
Video recording
Your Answer
Video recording

Multiple Choice Multiple Answer
Question
Remedial actions for error of misunderstanding is :-
Correct Answer
Training , Checking in advance , Standardizing work procedures
Your Answer
Training , Checking in advance , Standardizing work procedures

Multiple Choice Multiple Answer
Question
Missing parts is due to :-
Correct Answer
Willful errors , Inadvertent error , Judgment error
Your Answer
Willful errors , Inadvertent error

True/False
Question
Flow chart helps to design new process.
Correct Answer
True
Your Answer
False

Multiple Choice Single Answer
Question
SWOT analysis is an important step in :-
Correct Answer
Deciding what to benchmark
Your Answer
Data collection

Multiple Choice Single Answer
Question
Quality circle should consist adequate experienced members between :-
Correct Answer
8 to 10
Your Answer
8 to 10

Multiple Choice Single Answer
Question
Identifying key preventive operational functions and comparing these operational functions within the firm's own division & branches comes under :-
Correct Answer
Internal benchmarking
Your Answer
Internal benchmarking

Multiple Choice Single Answer
Question
Flow charts are drawn to document a process by charting the task performed and :-
Correct Answer
The sequence in which tasks are performed
Your Answer
The flow in which tasks are performed



Multiple Choice Single Answer
Question
Whatever you are doing you can do better by :-
Correct Answer
Kaizen
Your Answer
Kaizen

Select The Blank
Question
In scatter diagram "________" relationship is said to exist when value of 'y' somewhat increases as the value of 'x' increases.
Correct Answer
Weak positive
Your Answer
Weak positive

Multiple Choice Multiple Answer
Question
After finding out the solution & working on it, the equally important job is :-
Correct Answer
Prepare for the presentation of your work , Explain the progress by presentation to steering committee , Convince committee for financial help for running the project
Your Answer
Prepare for the presentation of your work , Explain the progress by presentation to steering committee , Convince committee for financial help for running the project

Select The Blank
Question
Poka Yoke designed to help operators to know immediately ________ of the defeat called detection type Poka-Yoke.
Correct Answer
On occurrence
Your Answer
On occurrence

Multiple Choice Single Answer
Question
TQM is :-
Correct Answer
A continuous activity
Your Answer
A continuous activity

Multiple Choice Single Answer
Question
In cellular manufacturing system, the cells are designed so that the material flow within the cell and between the cells are :-
Correct Answer
Minimized
Your Answer
Minimized

Multiple Choice Multiple Answer
Question
Some steps for stratification are :-
Correct Answer
Present the information in graphical form & study, decide if further stratification is required? , Define the problem & identify the stratification variables , Sort out data into categories & summarise information in each category
Your Answer
Define the problem & identify the stratification variables , Sort out data into categories & summarise information in each category , Present the information in graphical form & study, decide if further stratification is required?

Match The Following
Match The Following
Question
Correct Answer
Your Answer
Review your efforts & success achieved
Check
Act
Act about the causes found out
Do
Do
Collect the initial data for the problem
Plan
Plan
Actions further after reviewing the progress
Act
Check

Multiple Choice Multiple Answer
Question
Implementation of TPM in Indian industries is difficult due to :-
Correct Answer
Lack of knowledge of the TPM , Resistance to change , Fear to loss of job
Your Answer
Lack of knowledge of the TPM , Resistance to change , Fear to loss of job

Select The Blank
Question
________ helps to generate creative ideas .
Correct Answer
Brainstorming
Your Answer
Brainstorming

Multiple Choice Single Answer
Question
Zero problem are those where in objective is :-
Correct Answer
To completely eliminate the problem
Your Answer
To completely eliminate the problem

True/False
Question
Muda due to waiting during assembly, during machining processing is very easy to detect.
Correct Answer
False
Your Answer
False

Multiple Choice Single Answer
Question
Recording of the entire setup operators focusing on hand, eye and body movements of the person doing the setting is done through :-
Correct Answer
Video recording
Your Answer
Video recording

Select The Blank
Question
Kaizen projects are managed by ________
Correct Answer
Cross functional team
Your Answer
Management

Select The Blank
Question
In traditional purchasing ________ inventory is required.
Correct Answer
Plenty of
Your Answer
Plenty of


LIST OF ATTEMPTED QUESTIONS AND ANSWERS



Select The Blank
Question
Kaizen projects are managed by ________
Correct Answer
Cross functional team
Your Answer
Management

Select The Blank
Question
In traditional purchasing ________ inventory is required.
Correct Answer
Plenty of
Your Answer
Plenty of

Multiple Choice Multiple Answer
Question
Implementation of TPM in Indian industries is difficult due to :-
Correct Answer
Lack of knowledge of the TPM , Resistance to change , Fear to loss of job
Your Answer
Lack of knowledge of the TPM , Resistance to change , Fear to loss of job

Multiple Choice Multiple Answer
Question
Actions that can be thought for the process having process capability is smaller than specification tolerance are:-
Correct Answer
Use of less precision machine , Possibility of squeezing tolerances , Reduction in inspection
Your Answer
Use of less precision machine , Possibility of squeezing tolerances , Reduction in inspection

Multiple Choice Multiple Answer
Question
Role of champions are :-
Correct Answer
Approve six sigma projects , Remove road block in the path of six sigma implementation , Monitor progress of six sigma projects
Your Answer
Approve six sigma projects , Remove road block in the path of six sigma implementation , Monitor progress of six sigma projects

Multiple Choice Single Answer
Question
Poka-yoke for employee not performing work as per established method is :-
Correct Answer
Implement work standard
Your Answer
Implement work standard

True/False
Question
Inadequate maintenance of machine leads to muda of defects
Correct Answer
True
Your Answer
False

Select The Blank
Question
Histogram is a diagrammatic presentation of the ________ distribution of characteristics such as strength, diameter, etc.
Correct Answer
Frequency
Your Answer
Frequency

Multiple Choice Multiple Answer
Question
Types of meetings held in DWM are :-
Correct Answer
Daily PDCA meeting , Weekly PDCA meeting , Monthly PDCA meeting
Your Answer
Daily PDCA meeting , Weekly PDCA meeting , Monthly PDCA meeting

Select The Blank
Question
________ is responsible for effective implementation of action plan's under TPM.
Correct Answer
Steering committee
Your Answer
Maintenance department

Select The Blank
Question
________ is an effect due to the muda of defect.
Correct Answer
Wear & tear of parts while disassembling
Your Answer
Wear & tear of parts while disassembling

Multiple Choice Single Answer
Question
Participants of the groups for quality circles should be decided by :-
Correct Answer
Employees coming together by their own enthusiasm
Your Answer
Employees coming together by their own enthusiasm

Multiple Choice Single Answer
Question
Japanese concept of good house keeping is for:
Correct Answer
Good environment for quality products
Your Answer
Good environment for quality products

Select The Blank
Question
Japanese believe that when they are ________ they are cleaning there minds too.
Correct Answer
Cleaning
Your Answer
Cleaning

Multiple Choice Single Answer
Question
Initiative CA/PA for customer complaint is check point for :-
Correct Answer
Response to customer complaint
Your Answer
Response to customer complaint

Multiple Choice Multiple Answer
Question
Breakdown problem may be stratified by :-
Correct Answer
Sections , Machines , Type of breakdown (e.g mech. Or electrical)
Your Answer
Machines , Type of breakdown (e.g mech. Or electrical)

Multiple Choice Multiple Answer
Question
Customer contact staff need training in areas like :-
Correct Answer
Questioning skills , Listening skills , Telephone attending techniques
Your Answer
Questioning skills , Listening skills , Telephone attending techniques

Multiple Choice Single Answer
Question
To sustain the 5-S throughout the months best method is :-
Correct Answer
Start surprise internal audits
Your Answer
Declare prizes

Multiple Choice Single Answer
Question
Recording of the entire setup operators focusing on hand, eye and body movements of the person doing the setting is done through :-
Correct Answer
Video recording
Your Answer
Video recording

Multiple Choice Multiple Answer
Question
Remedial actions for error of misunderstanding is :-
Correct Answer
Training , Checking in advance , Standardizing work procedures
Your Answer
Training , Checking in advance , Standardizing work procedures

Multiple Choice Multiple Answer
Question
Missing parts is due to :-
Correct Answer
Willful errors , Inadvertent error , Judgment error
Your Answer
Willful errors , Inadvertent error

True/False
Question
Flow chart helps to design new process.
Correct Answer
True
Your Answer
False

Multiple Choice Single Answer
Question
SWOT analysis is an important step in :-
Correct Answer
Deciding what to benchmark
Your Answer
Data collection

Multiple Choice Single Answer
Question
Quality circle should consist adequate experienced members between :-
Correct Answer
8 to 10
Your Answer
8 to 10

Multiple Choice Single Answer
Question
Identifying key preventive operational functions and comparing these operational functions within the firm's own division & branches comes under :-
Correct Answer
Internal benchmarking
Your Answer
Internal benchmarking

Multiple Choice Single Answer
Question
Flow charts are drawn to document a process by charting the task performed and :-
Correct Answer
The sequence in which tasks are performed
True/False
Question
Performance benchmarking does not involves comparison of financial ratios at the aggregate level.
Correct Answer
False
Your Answer
False

Multiple Choice Single Answer
Question
Setup time includes :-
Correct Answer
Internal setup time & External setup time
Your Answer
Internal setup time & External setup time

Multiple Choice Single Answer
Question
Participants of the groups for quality circles should be decided by :-
Correct Answer
Employees coming together by their own enthusiasm
Your Answer
Employees coming together by their own enthusiasm

Multiple Choice Single Answer
Question
Check sheet are also used as :-
Correct Answer
Data gathering & interpretation tool
Your Answer
Data gathering & interpretation tool

Multiple Choice Single Answer
Question
SMED means :-
Correct Answer
Single minute exchange of dies
Your Answer
Single minute exchange of dies

Match The Following
Question
Correct Answer
Your Answer
Productivity performance measurement
Turnover employee
Cost of quality
Financial performance measurement
Sales of the months
Sales of the months
Customer satisfaction measurement
Customer complaints per period
Customer complaints per period
Staff attitude measurement
Employee satisfaction index
Employee satisfaction index

Select The Blank
Question
________ is an effect due to the muda of defect.
Correct Answer
Wear & tear of parts while disassembling
Your Answer
Poor production planning & control

Select The Blank
Question
If some defective parts are discovered by the subsequent process they should be returned to the ________ to prevent reoccurrence.
Correct Answer
Preceding process
Your Answer
Return to stores

Multiple Choice Multiple Answer
Question
The results oriented efforts of the quality circle should also include :-
Correct Answer
Efforts to avoid the problem permanently , Ultimate aim of the customers satisfaction , Attacking the real root causes & all possibilities
Your Answer
Efforts to avoid the problem permanently , Publication or advertisement of your contribution , Attacking the real root causes & all possibilities

Match The Following
Question
Correct Answer
Your Answer
Parato diagram always indicates
Magnitude of defects
Philosophy of 20% of the activity causes 80% of the effect
Parato analysis underlines & operates on
Philosophy of "vital few:trivial many"
Philosophy of "vital few:trivial many"
Parato analysis is technique of identifying vital causes by
Arranging data according to the descending order of their frequency of occurrence
Arranging data according to the descending order of their frequency of occurrence
Parato diagram is a Bar graph with height or value drawn by
Arranging data in descending order
Magnitude of defects

Multiple Choice Multiple Answer
Question
Few steps in construction in Radar chart are :-
Correct Answer
Brainstorming to enlist characteristics which require to be evaluated & draw the circle & divide it into 'slices' equal to number of characteristics , The first slice begins at 12 noon. Then draw vertical line & calibrate it equal to the number of levels required , Draw concentric circles from each gradiation using 'o' point as centre
Your Answer
Brainstorming to enlist characteristics which require to be evaluated & draw the circle & divide it into 'slices' equal to number of characteristics , The first slice begins at 12 noon. Then draw vertical line & calibrate it equal to the number of levels required , Draw concentric circles from each gradiation using 'o' point as centre

Select The Blank
Question
5 S audit result is discussed in ________ meeting.
Correct Answer
Monthly
Your Answer
Monthly

True/False
Question
Fishbone analysis is used both in analysis & planning.
Correct Answer
True
Your Answer
False

Multiple Choice Single Answer
Question
One Green Belt may head a team of :-
Correct Answer
20 employees
Your Answer
20 employees

Multiple Choice Multiple Answer
Question
Role of champions are :-
Correct Answer
Approve six sigma projects , Remove road block in the path of six sigma implementation , Monitor progress of six sigma projects
Your Answer
Monitor progress of six sigma projects , Approve six sigma projects , Remove road block in the path of six sigma implementation

Multiple Choice Multiple Answer
Question
To draw control charts, sample must be representative of homogeneous segment of production for which :-
Correct Answer
The items of the sample should be from the same machine setting , The items should be of the same batch , Items should be made from the same raw material batch
Your Answer
The items of the sample should be from the same machine setting , The items should be of the same batch , Items should be made from the same raw material batch

Multiple Choice Single Answer
Question
Failure mode and effect analysis (FMEA) establish
Correct Answer
Process failure and minimize frequency
Your Answer
Process failure and minimize frequency

Multiple Choice Multiple Answer
Question
What are the steps in deciding the benchmarking partner?
Correct Answer
Decide level of benchmarking , List down a few prospective candidates of partnership , Collect information of short listed partners
Your Answer
Decide level of benchmarking , List down a few prospective candidates of partnership , Collect information of short listed partners

Multiple Choice Single Answer
Question
One Master Black Belt may head a team of :-
Correct Answer
15-20 Black Belts
Your Answer
15-20 Black Belts

Multiple Choice Single Answer
Question
Competitive benchmarking involves identifying key competitive product, services or processes & comparing with those of :-
Correct Answer
Main competitor
Your Answer
Main competitor

Multiple Choice Single Answer
Question
Implication of Quality problem is:-
Correct Answer
Gap in performance
Your Answer
Gap in performance

No comments:

Post a Comment