Search the Assignments and Papers Here...

Cases in Operations Management - A02


Select The Blank
Question
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Jigs and fixtures once provided will be able to maintain accuracy up to about ________ pieces.
Correct Answer
20000
Your Answer
20000

Select The Blank
Question
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Duration of project can be reduced if duration of an activity on ________ path is reduced.
Correct Answer
Critical
Your Answer
Critical

Multiple Choice Single Answer
Question
This Question refers to the case of 'Kerson Automobiles' : Cars are manually pushed over the wooden stand placed in the major repairs section because of :-
Correct Answer
Absence of the underground pit
Your Answer
Absence of the underground pit

Multiple Choice Multiple Answer
Question
This Question refers to the case of 'The Gujrat Engineering company Limited' : The company has received a special order where :-
Correct Answer
A special cylinder is to be manufactured. , The item is to be manufactured from a hollow bored forging , Fastest delivery is requested
Your Answer
A special cylinder is to be manufactured. , The item is to be manufactured from a hollow bored forging , Fastest delivery is requested

Select The Blank
Question
This Question refers to the case of 'Hansa Tractomotive Ltd.' : The loss of consignment was ________.
Correct Answer
Total
Your Answer
Total

True/False
Question
This Question refers to the case of 'Classic Engineering Components Ltd.' : Mr. Sen noticed that each worker was provided with the drawing of the component.
Correct Answer
False
Your Answer
False

Multiple Choice Multiple Answer
Question
This Question refers to the case of 'Eagle Machine Company' : Cost of running Sally's department is Rs 3,70,000 per year. This is on account of :-
Correct Answer
Salaries , Fringes , Expenses
Your Answer
Salaries , Fringes , Expenses

Multiple Choice Multiple Answer
Question
This question refers to case on 'Morbay Engineering Works (MEW)' : An incentive plan can be considered as a tool for following:-
Correct Answer
Increase productivity , Create more capacity , Reduce manufacturing costs
Your Answer
Increase productivity , Create more capacity , Reduce manufacturing costs

Multiple Choice Multiple Answer
Question
This Question refers to the case of 'Kerson Automobiles' : The huge work table placed outside the machine shop can be used to carry out :-
Correct Answer
Filing work , Debarring work , Cleaning work
Your Answer
Filing work , Debarring work , Cleaning work

Multiple Choice Single Answer
Question
This Question refers to the case of 'Autogears Private Limited' : The management is interested in the following :-
Correct Answer
Improved method of working
Your Answer
Improved method of working

Multiple Choice Single Answer
Question
This Question refers to the case of 'Universal Fasteners Ltd.' : Mr. Bose, Purchase Engineer informed Mr. Kaul that previous lot of 500 kg material was purchased from :-
Correct Answer
A source who is not in the approved list
Your Answer
A source who is not in the approved list

True/False
Question
This question refers to case on Morbay Engineering Works (MEW).Overtime tend to reward more than incentive scheme.
Correct Answer
True
Your Answer
True

Multiple Choice Single Answer
Question
This Question refers to the case of 'Divgi Metalwares Private Limited' : The company is manned by :-
Correct Answer
Professional managers
Your Answer
Professional managers

Select The Blank
Question
This Question refers to the case of 'Eagle Machine Company' : The purchase department is responsible only for buying and ________.
Correct Answer
Expediting
Your Answer
Expediting

Select The Blank
Question
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Delays in completion of ________ would increase Project cost.
Correct Answer
Project
Your Answer
Project

Select The Blank
Question
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Fixed ________ are to be computed only when machines need to be purchased.
Correct Answer
Overhead
Your Answer
Overhead

Select The Blank
Question
The question refer to the case on 'Kalpak Engineers' : Raw material in the form of bar stock is supplied by the ________.
Correct Answer
Customer
Your Answer
Customer

True/False
Question
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Cost of reject above 5% machining rejection is borne by the vendor.
Correct Answer
True
Your Answer
True

Select The Blank
Question
This question refers to 'Automotive Gears Private Limited' : The case study requires calculation of set up ________ for the job.
Correct Answer
Cost
Your Answer
Cost

Multiple Choice Single Answer
Question
This Question refers to the case of 'Kerson Automobiles' : It was decided to modify the existing layout of the plant in the year :-
Correct Answer
1972
Your Answer
1972

Multiple Choice Single Answer
Question
This Question refers to the case of 'The Geer Company' : The company had a small foundry until 1946. This was subsequently closed and the purchase of ferrous castings were handled by :-
Correct Answer
A man who had been a supervisor in the foundry
Your Answer
A man who had been a supervisor in the foundry

Multiple Choice Single Answer
Question
This Question refers to the case of 'Classic Engineering Components Ltd.' : This company was acquired by Das Group of Industries. Mr. Mohit Sen,(head of Business planning function in the corporate office) was visiting the factory as its :-
Correct Answer
Turn over was stagnating
Your Answer
Turn over was stagnating

Select The Blank
Question

This question refers to case on 'Morbay Engineering Works (MEW)' : Overtime must be ________ to guarantee the success of the wage incentive scheme.
Correct Answer
Eliminative
Your Answer
Eliminative

Multiple Choice Single Answer
Question
This Question refers to the case 'Quality Gauges Pvt. Ltd.' : The scheme shall apply to :-
Correct Answer
Each and every employee
Your Answer
Each and every employee

Multiple Choice Multiple Answer
Question
This Question refers to the case of 'K.T Gears' : The groove cutting operation is performed by :-
Correct Answer
Holding the gear blank on a mandrel in face plate , Cutting the groove by two tools , One tool is held in rear side and other held in front side
Your Answer
Holding the gear blank on a mandrel in face plate , Cutting the groove by two tools , One tool is held in rear side and other held in front side

Multiple Choice Multiple Answer
Question
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : If the Exhaust Manifold is to be manufactured in house, following are the requirements:-
Correct Answer
New jigs and fixtures , Additional shift , Additional manpower
Your Answer
New jigs and fixtures , Additional shift

Multiple Choice Single Answer
Question
This Question refers to the case of 'Classic Engineering Components Ltd.' : The responsibility of physical movement of material was assigned to :-
Correct Answer
Helpers
Your Answer
Helpers

Select The Blank
Question
This Question refers to the case of 'Autogears Private Limited' : The task given is to redraw ________ activity chart for the improved method.
Correct Answer
Multiple
Your Answer
Multiple

Multiple Choice Single Answer
Question
This Question refers to the case 'Suyog Udyog' : Balancing weights are manufactured using facilities arranged in :-
Correct Answer
Process type of layout
Your Answer
Process type of layout

True/False
Question
This question refers to case on 'Morbay Engineering Works (MEW)' : "It is difficult to install an incentive scheme and easy to withdraw when desired."
Correct Answer
False
Your Answer
False

Multiple Choice Multiple Answer
Question
This Question refers to the case of 'Universal Fasteners Ltd.' : Mr Sharma, Production Engineer informed Mr. Kaul that :-
Correct Answer
Material testing was done by a worker as Raw Material Inspector was absent , Visual checking for cracks on sample basis was carried out , Heat treatment operator is a new one .
Your Answer
Material testing was done by a worker as Raw Material Inspector was absent , Visual checking for cracks on sample basis was carried out , Heat treatment operator is a new one .

Multiple Choice Multiple Answer
Question
This Question refers to the case of 'Divgi Metalwares Private Limited' : The new items contracted by the company are handled by the development department for :-
Correct Answer
Submission of samples , Manufacture of one or two production lots , Transfer to manufacturing department for regular production, after successful development
Your Answer
Submission of samples , Manufacture of one or two production lots , Transfer to manufacturing department for regular production, after successful development

Multiple Choice Multiple Answer
Question
This Question refers to the case of 'Hansa Tractomotive Ltd.': The contract with Kay Jee Hydraulics Ltd was agreed with following terms & conditions :-
Correct Answer
Price per unit FOR Bombay , Delivery 10-12 weeks after receipt of buyer's confirmed order , Payment 60 days after dispatch of material
Your Answer
Price per unit FOR Bombay , Delivery 10-12 weeks after receipt of buyer's confirmed order , Payment 60 days after dispatch of material

Match The Following
Question
Correct Answer
Your Answer
Activity in CPM
Arrow
Arrow
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Critical Path
Project duration
Project duration
CPM/PERT
Project planning/ scheduling technique
Project planning/ scheduling technique
Cost overrun
Delays in project
Delays in project

Multiple Choice Single Answer
Question
This question refer to the case on "Allied Industries Pvt Ltd" : Following cost element is considered while calculating total cost of buying :-
Correct Answer
Transport cost
Your Answer
Transport cost

Multiple Choice Multiple Answer
Question
This Question refers to the case of 'Divgi Metalwares Private Limited' : As per the Activity description given in the table, Preparation of operational layout activity affects following activities :-
Correct Answer
Design and draft hobbing fixture , Procure plug gauge , Procure ring gauge
Your Answer
Design and draft hobbing fixture , Procure plug gauge , Procure ring gauge

True/False
Question
This Question refers to the case of 'Universal Fasteners Ltd.' : The organization has reputation for poor deliveries.
Correct Answer
False
Your Answer
True

True/False
Question
This question refers to the case of 'Northern Machinery Ltd' : The company's suppliers are of all sizes and scattered across the country.
Correct Answer
True
Your Answer
True

Multiple Choice Single Answer
Question
This Question refers to the case 'Indus Foundries Ltd.':Parveen Kumar proposed to set up a :-
Correct Answer
Cast Iron foundry
Your Answer
Cast Iron foundry

Multiple Choice Multiple Answer
Question
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Following is the information requirement for using CPM/PERT techniques:-
Correct Answer
List of activities , Activity duration , Precedent relationship of the activities
Your Answer
List of activities , Activity duration , Precedent relationship of the activities

True/False
Question
This Question refers to the case of Narmada Electricals Ltd. Mr. Jain proposed that for accounting of material, and to carry out other task, two additional clerks shall be recruited
Correct Answer
True
Your Answer
True

Select The Blank
Question
This Question refers to the case of 'Kerson Automobiles' : The pedestal grinder mounted on the huge work table, gives out ________ and blows out dust.
Correct Answer
Sparks
Your Answer
Sparks

True/False
Question
This Question refers to the case of 'Universal Fasteners Ltd.' : Mr. Sharma, Production Engineer informed Mr. Kaul that Hardening & Tempering was the last operation.
Correct Answer
True
Your Answer
True

Match The Following
Question
Correct Answer
Your Answer
Anonymous letter received by M.D.
Need to justify
Need to justify
This question refers to the case of 'Northern Machinery Ltd.' : Senior buyers
Seen in top hotels with suppliers
Seen in top hotels with suppliers
Reason for failure to convince the Board of Directors
No material facts to support the arguments
No material facts to support the arguments
Lot of items on the agenda
Need to be concise and to the point
Need to be concise and to the point

True/False
Question
This Question refers to the case of 'Artwood Products' : It is necessary to keep stock of standard furniture to cater to sudden requirement of the customers.
Correct Answer
True
Your Answer
True

True/False
Question
This Question refers to the case of 'The Irate Vendor' : The President knows that some changes in purchasing policy are being planned.
Correct Answer
True
Your Answer
True

Multiple Choice Multiple Answer
Question
This Question refers to the case of 'The Gujrat Engineering company Limited' : The company has received a special order where :-
Correct Answer
Fastest delivery is requested , A special cylinder is to be manufactured. , The item is to be manufactured from a hollow bored forging
Your Answer
A special cylinder is to be manufactured. , The item is to be manufactured from a hollow bored forging , Fastest delivery is requested

Multiple Choice Multiple Answer
Question
This Question refers to the case of 'Classic Engineering Components Ltd.' : The company has well established machine shop having more than 150 machines and :-
Correct Answer
A heat treatment shop , Metrology section , Packing section
Your Answer
A heat treatment shop , Metrology section , Packing section

True/False
Question
This Question refers to the case of 'Divgi Metalwares Private Limited' : The order has been finalized from a leading engineering firm.
Correct Answer
False
Your Answer
False

Multiple Choice Single Answer
Question
The question refer to the case on 'Kalpak Engineers' : In the case for all machining operations following data on time is furnished:-
Correct Answer
Setup time and standard time separately
Your Answer
Setup time and standard time separately

Select The Blank
Question
The question refer to the case on 'Kalpak Engineers' : The sawed off pieces from power hacksaw are then moved to ________ facing and centering machine.
Correct Answer
Special- purpose
Your Answer
Special- purpose

Select The Blank
Question
This question refer to the case on "Allied Industries Pvt Ltd" : Allied Industries Pvt ltd is a small ________ concern with 25 workmen.
Correct Answer
Proprietary
Your Answer
Proprietary

True/False
Question
This Question refers to the case 'Quality Gauges Pvt. Ltd.' : As per union, fixation of time standards for the gauges will lead to large scale rejection.
Correct Answer
True
Your Answer
True

Match The Following
Question
Correct Answer
Your Answer
Anonymous letter received by M.D.
Need to justify
Need to justify
This question refers to the case of 'Northern Machinery Ltd.' : Senior buyers
Seen in top hotels with suppliers
Seen in top hotels with suppliers
Reason for failure to convince the Board of Directors
No material facts to support the arguments
No material facts to support the arguments
Lot of items on the agenda
Need to be concise and to the point
Need to be concise and to the point

Multiple Choice Multiple Answer
Question
This Question refers to the case 'Suyog Udyog' : The process involves the use of :-
Correct Answer
HMT M-2V machine , HMT-2U machine , Investa Pillar drill
Your Answer
HMT M-2V machine , HMT-2U machine , Investa Pillar drill

Multiple Choice Single Answer
Question
The question refer to the case on 'Kalpak Engineers' : Process sheet does not provide following data:-
Correct Answer
Shift
Your Answer
Shift

Multiple Choice Multiple Answer
Question
This question refers to case on 'Morbay Engineering Works (MEW)' : Following are the characteristics of scalon plan:-
Correct Answer
All employees receive a guaranteed time wage , Incentive bonus is based on reduction in labour to sales ratio , A standard for the ratio of labour cost to the total sales value is set as an index
Your Answer
All employees receive a guaranteed time wage , Incentive bonus is based on reduction in labour to sales ratio , A standard for the ratio of labour cost to the total sales value is set as an index

Multiple Choice Single Answer
Question
This Question refers to the case of 'National Engineering Co.' : Mr. Kher, Material Manager, had talked to supplier who agreed to take back the 2200 kgs of 22 A/F En 1 in stock at :-
Correct Answer
The rate he sold to them
Your Answer
The rate he sold to them

Match The Following
Question
Correct Answer
Your Answer
Equipment cost
Capital recovery factor
Capital recovery factor
This question refer to the case on "Allied Industries Pvt Ltd." : Variable cost
Power cost
Power cost
Fixed cost
Space cost
Space cost
Item
Sealing pump
Sealing pump

True/False
Question
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : The management knew the activities involved, their durations and interrelationship, still are not in position to tell when the project will be completed.
Correct Answer
True
Your Answer
True

Multiple Choice Single Answer
Question
This Question refers to the case of 'The Geer Company' : The purchase of steel was done exclusively by :-
Correct Answer
One buyer
Your Answer
One buyer

Multiple Choice Multiple Answer
Question
The question refer to the case on 'Kalpak Engineers' : For manufacturing Stay Bolt following machines are planned:-
Correct Answer
Copying Lathe , Radial Drilling Machine , Thread Rolling machine
Your Answer
Copying Lathe , Radial Drilling Machine , Thread Rolling machine

Multiple Choice Multiple Answer
Question
The question refer to the case on 'Kalpak Engineers' : Following are the operations involved in manufacturing stay bolt in the case:-
Correct Answer
Copy turning , Thread Rolling , Drilling
Your Answer
Copy turning , Thread Rolling , Drilling

True/False
Question
This Question refers to the case of 'Universal Fasteners Ltd.' : Mr. Sharma, Production Engineer informed Mr. Kaul that Hardening & Tempering was the last operation.
Correct Answer
True
Your Answer
True

Multiple Choice Single Answer
Question
This Question refers to the case 'Quality Gauges Pvt. Ltd.' : Incentive scheme was finalized based on :-
Correct Answer
Monthly sales
Your Answer
Monthly sales

Multiple Choice Multiple Answer
Question
This Question refers to the case of 'Divgi Metalwares Private Limited' : The new items contracted by the company are handled by the development department for :-
Correct Answer
Submission of samples , Manufacture of one or two production lots , Transfer to manufacturing department for regular production, after successful development
Your Answer
Submission of samples , Manufacture of one or two production lots , Transfer to manufacturing department for regular production, after successful development

Multiple Choice Single Answer
Question
This Question refers to the case 'Indus Foundries Ltd.':Parveen Kumar proposed to set up a :-
Correct Answer
Cast Iron foundry
Your Answer
Cast Iron foundry

Multiple Choice Single Answer
Question
This Question refers to the case of 'K.T Gears' :To study the company's blanking operations to improve methods and fix labour performance standards, the company has constituted :-
Correct Answer
An industrial engineering department
Your Answer
An industrial engineering department

True/False
Question
This question refers to case on Morbay Engineering Works (MEW).Overtime tend to reward more than incentive scheme.
Correct Answer
True
Your Answer
True

Multiple Choice Multiple Answer
Question
This Question refers to the case of 'K.T Gears' : The firm is :-
Correct Answer
A proprietary firm , Engaged in manufacture of spur gears , Engaged in manufacture of helical gear
Your Answer
A proprietary firm , Engaged in manufacture of spur gears , Engaged in manufacture of helical gear

True/False
Question
This Question refers to the case of 'Kerson Automobiles' : Some areas can not be used because of odour emanating from adjoining two painting bays.
Correct Answer
True
Your Answer
False

Select The Blank
Question
This Question refers to the case of 'The Irate Vendor' : As per Jones, the new ________ procedures were sound.
Correct Answer
Purchasing
Your Answer
Purchasing

Multiple Choice Multiple Answer
Question
This Question refers to the case of 'National Engineering Co.' : The GM instructed the Finance Manager that in the next meeting :-
Correct Answer
Cutting tools should be analyzed , Stationery should be analyzed , Every one should sit and devise the action plan to fix items in these groups & give a time bound specific program within next two days
Your Answer
Cutting tools should be analyzed , Stationery should be analyzed , Every one should sit and devise the action plan to fix items in these groups & give a time bound specific program within next two days

Multiple Choice Single Answer
Question
This Question refers to the case of 'Artwood Products' : The company is engaged in design and manufacture of wooden furniture. The critical factor in acceptance of furniture is :-
Correct Answer
Quality
Your Answer
Quality

Select The Blank
Question
This Question refers to the case of 'Classic Engineering Components Ltd.' : It was observed that there was no ________ or any marking system to know identification of the components, their status in terms of acceptance/rejection and quantity of the components in the bins.
Correct Answer
Tag
Your Answer
Tag

Select The Blank
Question
This Question refers to the case of 'The Gujrat Engineering company Limited' : A compromise was finally reached in which the supplier agreed to ________ the cancellation charges.
Correct Answer
Withdraw
Your Answer
Withdraw

Multiple Choice Single Answer
Question
This Question refers to the case of 'Divgi Metalwares Private Limited' : The table given in the case study gives details of activities and expected time for the same. It requires construction of :-
Correct Answer
Network diagram of the activities
Your Answer
Network diagram of the activities

Select The Blank
Question
This Question refers to the case 'Suyog Udyog' : The process sheet involves selection of ________ time.
Correct Answer
Cycle
Your Answer
Cycle

Multiple Choice Single Answer
Question
The question refer to the case on 'Kalpak Engineers' :Kalpak Engineers have contracted from a boiler company manufacturing of 500 nos of stay bolt. In the manufacturing process grinding operation is carried out on following machine :-
Correct Answer
Cylindrical grinder
Your Answer
Cylindrical grinder

Select The Blank
Question
This Question refers to the case of 'The Geer Company' : The volume of growth tripled due to ________ management.
Correct Answer
Aggressive
Your Answer
Aggressive

True/False
Question
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Cost of reject above 5% machining rejection is borne by the vendor.
Correct Answer
True
Your Answer
False

True/False
Question
This Question refers to the case of 'Narmada Electricals Ltd.' :The rates of scrap were reviewed from time to time.
Correct Answer
False
Your Answer
False

Select The Blank
Question
This Question refers to the case of 'Narmada Electricals Ltd.' : NEL has plans for expanding its activities and shortage ________ was one of the major constraints for its plans.
Correct Answer
Space
Your Answer
Space

Select The Blank
Question
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : The item exhaust manifold is presently not ________.
Correct Answer
Manufactured
Your Answer
Manufactured

Select The Blank
Question
This Question refers to the case 'Quality Gauges Pvt. Ltd.' : The agreement mentioned that Incentive amount will be paid along with ________.
Correct Answer
Wages
Your Answer
Wages

Multiple Choice Single Answer
Question
This Question refers to the case of 'Eagle Machine Company' : The company is facing following problem :-
Correct Answer
Sales are declining
Your Answer
Sales are declining

Multiple Choice Single Answer
Question
This Question refers to the case of 'The Gujrat Engineering company Limited' : A substantial portion of its sales are special order items on which manufacture is started :-
Correct Answer
Only after the order has been received from the buyer
Your Answer
Only after the order has been received from the buyer

Multiple Choice Single Answer
Question
This Question refers to the case of 'Universal Fasteners Ltd.' : Mr. Bose, Purchase Engineer informed Mr. Kaul that previous lot of 500 kg material was purchased from :-
Correct Answer
A source who is not in the approved list
Your Answer
A source who is not in the approved list

True/False
Question
This question refers to case on 'Morbay Engineering Works (MEW)' : Under Scanlon Plan employee is paid incentive bonus based on individual efforts and additional output.
Correct Answer
True
Your Answer
False

Multiple Choice Multiple Answer
Question
This Question refers to the case of 'Narmada Electricals Ltd.' : Production or Quality department decide when these become surplus/obsolete :-
Correct Answer
Part , Component , Item
Your Answer
Part , Component , Material

Select The Blank
Question
This Question refers to 'Uday Electroplating Shop' :The owner finds it ________ to get part time employees when there is heavy work load.
Correct Answer
Difficult
Your Answer
Difficult

Multiple Choice Multiple Answer
Question
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : project planning/scheduling techniques are called by following names:-
Correct Answer
CPM , PERT , Network Analysis
Your Answer
CPM , PERT , Network Analysis

Multiple Choice Multiple Answer
Question
This Question refers to the case of 'Hansa Tractomotive Ltd.' : After completion of manufacturing, Jay Jee took following actions :-
Correct Answer
Dispatched the consignment by Express Roadlines by truck , Raised the Hundi for the invoiced amount , Did not send the consignment by Hansa's designated carrier
Your Answer


Multiple Choice Single Answer
Question
This Question refers to the case of 'Northern Machinery Limited' : The V.P. asked Material Manager to prepare short report to be presented to board of directors about :-
Correct Answer
Buying policies
Your Answer
Buying policies

Multiple Choice Multiple Answer
Question
This Question refers to the case of 'Northern Machinery Limited' : As per Materials Manager basis of awarding contract is :-
Correct Answer
Justified in each case , All Purchase orders above Rs. 10,000/- are counter signed by him , All Purchase orders above Rs. 50,000/- are signed by V.P.
Your Answer
Justified in each case , All Purchase orders above Rs. 10,000/- are counter signed by him , All Purchase orders above Rs. 50,000/- are signed by V.P.

True/False
Question
This Question refers to the case of 'K.T Gears' : The activities performed by the operator are listed on the practitioner's data sheet.
Correct Answer
True
Your Answer
True

Multiple Choice Single Answer
Question
This Question refers to the case of 'Divgi Metalwares Private Limited' : The company is manned by :-
Correct Answer
Professional managers
Your Answer
Professional managers

Multiple Choice Multiple Answer
Question
This Question refers to the case of 'The Irate Vendor' : The old supplier :-
Correct Answer
Has been supplying for over 30 years , Does not understand why he has been cut off , Does not understand why no chance has been given to him to discuss his bid
Your Answer
Has been supplying for over 30 years , Does not understand why he has been cut off , Does not understand why no chance has been given to him to discuss his bid

Multiple Choice Multiple Answer
Question
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : While making Make or Buy decisions, Buy indicator includes following costs :-
Correct Answer
Raw material cost , Purchase cost , Fixed overhead cost
Your Answer
Raw material cost , Purchase cost

Multiple Choice Multiple Answer
Question
This Question refers to the case of 'Divgi Metalwares Private Limited' : As per the Activity description given in the table, Preparation of operational layout activity affects following activities :-
Correct Answer
Design and draft hobbing fixture , Procure plug gauge , Procure ring gauge
Your Answer
Design and draft hobbing fixture , Procure plug gauge , Procure ring gauge

True/False
Question
This question refers to case on 'Morbay Engineering Works (MEW)' : "It is difficult to install an incentive scheme and easy to withdraw when desired."
Correct Answer
False
Your Answer
False

Match The Following
Question
Correct Answer
Your Answer
Activity in CPM
Arrow
Circle
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Critical Path
Project duration
Project duration
CPM/PERT
Project planning/ scheduling technique
Project planning/ scheduling technique
Cost overrun
Delays in project
Delays in project

True/False
Question
This question refers to case on 'Morbay Engineering Works (MEW)' : Work sampling and production studies can be used to test viability of the performance standards.
Correct Answer
True
Your Answer
True

True/False
Question
This Question refers to the case of 'Eagle Machine Company' : The company buys a variety of material, ranging from a few ponds of rare metals to sizable quantities of sheet metal.
Correct Answer
True
Your Answer
True

Multiple Choice Single Answer
Question
This Question refers to the case 'Quality Gauges Pvt. Ltd.' : The scheme shall apply to :-
Correct Answer
Each and every employee
Your Answer
Each and every employee

Multiple Choice Multiple Answer
Question
This question refers to case on 'Morbay Engineering Works (MEW)' : An incentive plan can be considered as a tool for following:-
Correct Answer
Increase productivity , Create more capacity , Reduce manufacturing costs
Your Answer
Increase productivity , Create more capacity , Reduce manufacturing costs

Select The Blank
Question
This Question refers to the case of 'Kerson Automobiles' : Battery charger placed on one end of table creates ________.
Correct Answer
Nuisance
Your Answer
Nuisance

Multiple Choice Multiple Answer
Question
This Question refers to the case of 'The Irate Vendor' : The President's memorandum says :-
Correct Answer
We have treated this supplier unfairly , He would like to see if his complaint is justified , The Vendor's letter suggests that we do not have a policy on evaluating our vendors
Your Answer
We have treated this supplier unfairly , He would like to see if his complaint is justified , The Vendor's letter suggests that we do not have a policy on evaluating our vendors

Select The Blank
Question
This Question refers to the case 'Suyog Udyog' : Number of work stations are to be decided based on assumption that monthly off take is ________ numbers.
Correct Answer
8000
Your Answer
8000

Select The Blank
Question
This Question refers to the case of 'Universal Fasteners Ltd.' : Personnel Officer Mr. Sinha informed Mr. Kaul that Employee ________ is very high.
Correct Answer
Turnover
Your Answer
Turnover

Select The Blank
Question
This question refers to case on 'Morbay Engineering Works (MEW)' : In Scanlon Plan all employees receive guaranteed ________ wages.
Correct Answer
Time
Your Answer
Time

Select The Blank
Question
This question refers to 'Automotive Gears Private Limited' : The case study requires calculation of set up ________ for the job.
Correct Answer
Cost
Your Answer
Cost

Multiple Choice Multiple Answer
Question
This question refer to the case on "Allied Industries Pvt Ltd" : Variable cost consists of the following :-
Correct Answer
Cost of a pair thread roll , Regrinding charges on thread roll , Power cost
Your Answer
Cost of a pair thread roll , Regrinding charges on thread roll , Power cost

True/False
Question
This Question refers to the case 'Quality Gauges Pvt. Ltd.' : The executives were entitled for incentive bonus.
Correct Answer
True
Your Answer
True

Select The Blank
Question
This Question refers to the case 'Indus Foundries Ltd.' : Projected turnover in the first year itself is over ________ crore rupees.
Correct Answer
20
Your Answer
20

Select The Blank
Question
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : In order to save time in construction the management purchased a ________.
Correct Answer
Factory-building
Your Answer
Factory-building

Multiple Choice Single Answer
Question
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : One of the following is not a variable overhead:-
Correct Answer
Space
Your Answer
Cutting oil

True/False
Question
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : It is economical to continue subcontracting the machining of Exhaust Manifold to vendors.
Correct Answer
False
Your Answer
False

Select The Blank
Question
This Question refers to the case of 'Classic Engineering Components Ltd.' : Mr. Sen observed that the Machine Shop was looking ________.
Correct Answer
Congested
Your Answer
Congested

Multiple Choice Multiple Answer
Question
This Question refers to the case of 'Artwood Products' : The cost of manufacturing has increased due to :-
Correct Answer
Blockage of funds in inventory , Longer manufacturing cycle time , Poor quality of products
Your Answer
Blockage of funds in inventory , Longer manufacturing cycle time , Poor quality of products

Multiple Choice Multiple Answer
Question
This Question refers to the case of 'The Geer Company' : Problems got created due to :-
Correct Answer
Added work load in purchasing , Divided buying responsibilities , Number of inexperienced buyers
Your Answer
Added work load in purchasing , Divided buying responsibilities , Number of inexperienced buyers

Multiple Choice Single Answer
Question
This Question refers to the case of 'Universal Fasteners Ltd.' : During the meeting with G.M (Mr. Kaul) Store Keeper Mr. Bapat informed that purchases were made from :-
Correct Answer
Several sources
Your Answer
Several sources

Multiple Choice Single Answer
Question
This Question refers to the case 'Quality Gauges Pvt. Ltd.' : With the introduction of the scheme :-
Correct Answer
The sales picked up
Your Answer
The sales picked up

Multiple Choice Single Answer
Question
This Question refers to the case of 'Northern Machinery Limited' : The V.P. informed the Material Manager that the anonymous letter was received by :-
Correct Answer
M.D.
Your Answer
M.D., with copy to all the directors

Multiple Choice Single Answer
Question
This Question refers to the case of Narmada Electricals Ltd.: In the existing method, the scarp generated in processes like machining was stored in :-
Correct Answer
Scrap yard
Your Answer
Scrap yard

Multiple Choice Single Answer
Question
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : This case is on make-buy decision for an item. Name of that item is one of the below :-
Correct Answer
Exhaust Manifold
Your Answer
Exhaust Manifold

True/False
Question
This question refers to the case of 'Northern Machinery Ltd' : The company's suppliers are of all sizes and scattered across the country.
Correct Answer
True
Your Answer
True

Select The Blank
Question
This Question refers to the case of 'Hansa Tractomotive Ltd.' : Enroute to Delhi, the truck collided with an incoming ________.
Correct Answer
Tractor Trailer
Your Answer
Tractor Trailer

Multiple Choice Multiple Answer
Question
This Question refers to the case of 'Classic Engineering Components Ltd.' : The company supplies components to :-
Correct Answer
Automobile industries , Printing machines , Machine tool & process equipment industries
Your Answer
Automobile industries , Printing machines , Machine tool & process equipment industries

Multiple Choice Multiple Answer
Question
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Following are the activities involved in employee selection for WIPL :-
Correct Answer
Release of advertisement , Finalize job profile , Selecting candidates
Your Answer
Release of advertisement , Selecting candidates

Multiple Choice Single Answer
Question
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Use of Network Techniques beside computing project duration also helps in the following :-
Correct Answer
Possibilities of reducing project duration
Your Answer
Possibilities of reducing project duration

Multiple Choice Single Answer
Question
This Question refers to the case of 'Kerson Automobiles' :The option of shifting the workshop to another location at the outskirts of the city was shelved because :-
Correct Answer
Company was likely to lose business of spare parts and service of old cars
Your Answer
Company was likely to lose business of spare parts and service of old cars

Select The Blank
Question
This question refers to case on 'Morbay Engineering Works (MEW)' : Incentive scheme should not be regarded as a substitute for ________ wage structure.
Correct Answer
Poor
Your Answer
Poor

Multiple Choice Single Answer
Question
The question refer to the case on 'Kalpak Engineers' : This case is concerned with following element of production planning:-
Correct Answer
Routing
Your Answer
Routing

Match The Following
Question
Correct Answer
Your Answer
Machine shop congested with semi-processed material kept in the bins and components lying on the floors all around.
Shortage of space
Shortage of space
This Question refers to the case of 'Classic Engineering Components Ltd.' : Measuring instruments like vernier calipers, micrometers or gauges
Shared by operators
Shared by operators
Unispected lots
Processed
Processed
Responsibility of oiling /greasing
Maintenance department
Maintenance department

Multiple Choice Single Answer
Question
This Question refers to the case of 'Artwood Products' : As per study conducted by Mr. Tahil, it was observed that Artwood's profitability has :-
Correct Answer
Eroded
Your Answer
Eroded

Select The Blank
Question
This Question refers to the case of 'The Geer Company' : The company decided to engage a consulting firm to aid in re-organizing the ________ operation.
Correct Answer
Purchasing
Your Answer
Purchasing

Multiple Choice Multiple Answer
Question
This Question refers to the case of 'Kerson Automobiles' : As per consultants, problems are due to following reasons :-
Correct Answer
Material flow (Cars) is not smooth , A major chunk of productive time is lost in obtaining replacement of spares from stores. , Too often, helpers are found busy in transferring parts from work table to a hand trolley.
Your Answer
Material flow (Cars) is not smooth , A major chunk of productive time is lost in obtaining replacement of spares from stores. , Too often, helpers are found busy in transferring parts from work table to a hand trolley.

True/False
Question
This Question refers to the case of 'The Gujrat Engineering company Limited' : The company received an order and finally authorized completion of the forging and placed it in stock.
Correct Answer
False
Your Answer
True

True/False
Question
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : As extra capacity can be generated by starting an additional shift, hence fixed overheads are sizable.
Correct Answer
False
Your Answer
False


This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : If the Exhaust Manifold is to be manufactured in house, following are the requirements:-
a)
b)
c)
d)
New jigs and fixtures
Additional shift
Additional manpower
Additional machinery
41.
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Project duration can always be reduced by deploying additional recourses.
True
False

Multiple Choice Single Answer
Question
This question refer to the case on "Allied Industries Pvt Ltd" : Following cost element is not considered while calculating total cost of thread rolling in-house :-
Correct Answer
Transport cost
Your Answer
Transport cost

True/False
Question
This Question refers to the case of 'K.T Gears' : The activities performed by the operator are listed on the practitioner's data sheet.
Correct Answer
True
Your Answer
True

Multiple Choice Multiple Answer
Question
This Question refers to the case of 'Hansa Tractomotive Ltd.' : After completion of manufacturing, Jay Jee took following actions :-
Correct Answer
Dispatched the consignment by Express Roadlines by truck , Raised the Hundi for the invoiced amount , Did not send the consignment by Hansa's designated carrier
Your Answer
Dispatched the consignment by Express Roadlines by truck , Raised the Hundi for the invoiced amount , Did not send the consignment by Hansa's designated carrier

True/False
Question
This Question refers to the case of 'Hansa Tractomotive Ltd.' : Kay Jee dispatched the consignment as per the terms of the order.
Correct Answer
False
Your Answer
False

Multiple Choice Multiple Answer
Question
This Question refers to the case 'Suyog Udyog' : The process involves the use of :-
Correct Answer
HMT M-2V machine , HMT-2U machine , Investa Pillar drill
Your Answer
HMT M-2V machine , HMT-2U machine , Investa Pillar drill

True/False
Question
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : The cost of foundry reject is borne by the company.
Correct Answer
True
Your Answer
True

Select The Blank
Question
This Question refers to the case of 'Classic Engineering Components Ltd.' : Mr. Sen observed that the Machine Shop was looking ________.
Correct Answer
Congested
Your Answer
Congested

Multiple Choice Single Answer
Question
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Following is One apparent saving if the machining is done at the company's own plant:-
Correct Answer
Sale of scrap
Your Answer
Sale of scrap

Multiple Choice Multiple Answer
Question
This Question refers to the case of 'The Irate Vendor' : The President's memorandum says :-
Correct Answer
We have treated this supplier unfairly , He would like to see if his complaint is justified , The Vendor's letter suggests that we do not have a policy on evaluating our vendors
Your Answer
We have treated this supplier unfairly , He would like to see if his complaint is justified , The Vendor's letter suggests that we do not have a policy on evaluating our vendors

Multiple Choice Single Answer
Question
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Process sheet for exhaust manifold provides following information:-
Correct Answer
Jigs and fixtures required
Your Answer
Jigs and fixtures required

Multiple Choice Single Answer
Question
This question refers to case on 'Morbay Engineering Works (MEW)' : The success of an incentive plan to a large extent depends on the following factor:-
Correct Answer
Quality of performance standard
Your Answer
Quality of performance standard

Multiple Choice Multiple Answer
Question
This Question refers to the case of 'The Irate Vendor' : The old supplier :-
Correct Answer
Has been supplying for over 30 years , Does not understand why he has been cut off , Does not understand why no chance has been given to him to discuss his bid
Your Answer
Has been supplying for over 30 years , Does not understand why he has been cut off , Does not understand why no chance has been given to him to discuss his bid

Multiple Choice Single Answer
Question
This question refers to case on 'Morbay Engineering Works (MEW)' : One of the most popular and widely used incentive plan is called by following name:-
Correct Answer
Scanlon Plan
Your Answer
Scanlon Plan

Multiple Choice Single Answer
Question
This Question refers to the case of 'Classic Engineering Components Ltd.' : Mr. Sen noticed in the gangway a couple of bins containing :-
Correct Answer
Semi processed components
Your Answer
Semi processed components

Multiple Choice Single Answer
Question
This Question refers to 'Uday Electroplating Shop' : It is a job order :-
Correct Answer
Production unit
Your Answer
Production unit

Multiple Choice Multiple Answer
Question
This Question refers to the case of 'The Geer Company' : Problems got created due to :-
Correct Answer
Added work load in purchasing , Divided buying responsibilities , Number of inexperienced buyers
Your Answer
Added work load in purchasing , Divided buying responsibilities , Number of inexperienced buyers

Select The Blank
Question
This Question refers to the case of 'Narmada Electricals Ltd.' : NEL has plans for expanding its activities and shortage ________ was one of the major constraints for its plans.
Correct Answer
Space
Your Answer
Space

Multiple Choice Multiple Answer
Question
This question refers to case on 'Morbay Engineering Works (MEW)' : Following are some of the shortcomings of scanlon plan:-
Correct Answer
It rewards workers even if increase in sales is due to factor like price increase , The plan does not recognize individual efforts , The increase in labour cost due to wage agreement may result in lesser incentive bonus to the workmen
Your Answer
It rewards workers even if increase in sales is due to factor like price increase , The increase in labour cost due to wage agreement may result in lesser incentive bonus to the workmen

Multiple Choice Single Answer
Question
The question refer to the case on 'Kalpak Engineers' : In the case for all machining operations following data on time is furnished:-
Correct Answer
Setup time and standard time separately
Your Answer
Setup time and standard time separately

True/False
Question
This Question refers to the case of 'Divgi Metalwares Private Limited' : The order has been finalized from a leading engineering firm.
Correct Answer
False
Your Answer
False

Multiple Choice Single Answer
Question
This Question refers to the case of 'The Gujrat Engineering company Limited' : It is in the business of manufacturing of :-
Correct Answer
Hydraulic pumps & equipment
Your Answer
Hydraulic pumps & equipment

Select The Blank
Question
This question refers to case on 'Morbay Engineering Works (MEW)' : Many incentives schemes fail in their ________ due to 'loose standards'.
Correct Answer
Objectives
Your Answer
Objectives

Match The Following
Question
Correct Answer
Your Answer
Machine shop congested with semi-processed material kept in the bins and components lying on the floors all around.
Shortage of space
Shortage of space
This Question refers to the case of 'Classic Engineering Components Ltd.' : Measuring instruments like vernier calipers, micrometers or gauges
Shared by operators
Shared by operators
Unispected lots
Processed
Processed
Responsibility of oiling /greasing
Maintenance department
Maintenance department

Multiple Choice Multiple Answer
Question
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : If the Exhaust Manifold is manufactured in house, following costs wll increase:-
Correct Answer
Cost of power , Cost of labour , Cost of consumables like grease, lubricant
Your Answer
Cost of power , Cost of labour , Cost of consumables like grease, lubricant

Select The Blank
Question
This Question refers to the case of 'The Irate Vendor' : As per Jones, the new ________ procedures were sound.
Correct Answer
Purchasing
Your Answer
Purchasing

Multiple Choice Multiple Answer
Question
This Question refers to the case of National Engineering Co.
Correct Answer
Despatched the consignment by Express Roadlines by truck , Raised the Hundi for the invoiced amount , Did not send the consignment by Hansa's designated carrier
Your Answer
Despatched the consignment by Express Roadlines by truck , Raised the Hundi for the invoiced amount , Did not send the consignment by Hansa's designated carrier

Multiple Choice Multiple Answer
Question
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : project planning/scheduling techniques are called by following names:-
Correct Answer
CPM , PERT , Network Analysis
Your Answer
CPM , PERT , Network Analysis

True/False
Question
This Question refers to the case of 'Kerson Automobiles' : The decision to utilize gnagway space as "Service Bays" is good.
Correct Answer
False
Your Answer
False

Multiple Choice Multiple Answer
Question
This Question refers to the case of 'Autogears Private Limited' : Work elements performed by a gear shaving operator are :-
Correct Answer
Load gear on mandrel and secure it with a nut , Raise bed to enable gear teeth to mesh with cutter teeth , Unlock nut and remove gear from the mandrel
Your Answer
Load gear on mandrel and secure it with a nut , Raise bed to enable gear teeth to mesh with cutter teeth , Unlock nut and remove gear from the mandrel

Select The Blank
Question
This Question refers to the case of 'The Geer Company' : The volume of growth tripled due to ________ management.
Correct Answer
Aggressive
Your Answer
Aggressive

Match The Following
Question
Correct Answer
Your Answer
Equipment cost
Capital recovery factor
Capital recovery factor
This question refer to the case on "Allied Industries Pvt Ltd." : Variable cost
Power cost
Power cost
Fixed cost
Space cost
Space cost
Item
Sealing pump
Threaded nut

True/False
Question
This Question refers to the case 'Suyog Udyog' : The operation time for C' sunk 14 dia holes on both sides is 0.50 per piece.
Correct Answer
True
Your Answer
True

True/False
Question
This Question refers to the case 'Quality Gauges Pvt. Ltd.' : The executives were entitled for incentive bonus.
Correct Answer
True
Your Answer
False

Select The Blank
Question
This Question refers to the case of 'Universal Fasteners Ltd.' : Personnel Officer Mr. Sinha informed Mr. Kaul that Employee ________ is very high.
Correct Answer
Turnover
Your Answer
Turnover

Multiple Choice Single Answer
Question
This Question refers to the case of 'Northern Machinery Limited' : The V.P. asked Material Manager to prepare short report to be presented to board of directors about :-
Correct Answer
Buying policies
Your Answer
Buying policies

True/False
Question
This Question refers to the case 'Quality Gauges Pvt. Ltd.' : As per union, fixation of time standards for the gauges will lead to large scale rejection.
Correct Answer
True
Your Answer
True

Select The Blank
Question
This Question refers to the case of 'Artwood Products' : The ________ furniture is sold through distributors.
Correct Answer
Standard
Your Answer
Standard

Multiple Choice Single Answer
Question
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : This case is on make-buy decision for an item. Name of that item is one of the below :-
Correct Answer
Exhaust Manifold
Your Answer
Exhaust Manifold

Select The Blank
Question
This question refers to case on 'Morbay Engineering Works (MEW)' : Success of wage incentive plans to a large extent depends on the ________ of performance standards.
Correct Answer
Quality
Your Answer
Accuracy

True/False
Question
This Question refers to the case of 'Kerson Automobiles' : MD has agreed to carry out modification of existing plant.
Correct Answer
True
Your Answer
True

Select The Blank
Question
This Question refers to the case 'Suyog Udyog' : The process sheet involves selection of ________ time.
Correct Answer
Cycle
Your Answer
Cycle

Multiple Choice Single Answer
Question
This Question refers to the case of 'Northern Machinery Limited' : Khan had used a paper to deliver a talk to his senior buyers. This paper contained :-
Correct Answer
Summary of purchases
Your Answer
Summary of purchases

True/False
Question
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : As extra capacity can be generated by starting an additional shift, hence fixed overheads are sizable.
Correct Answer
False
Your Answer
False

Select The Blank
Question
This Question refers to the case of 'Northern Machinery Limited' : The V.P. instructed Materials Manager to collect ________ information and evidence to clarify that their system is foolproof.
Correct Answer
Relevant
Your Answer
Relevant

Select The Blank
Question
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : In order to save time in construction the management purchased a ________.
Correct Answer
Factory-building
Your Answer
Factory-building

Multiple Choice Multiple Answer
Question
The question refer to the case on 'Kalpak Engineers' : Following are the operations involved in manufacturing stay bolt in the case:-
Correct Answer
Copy turning , Thread Rolling , Drilling
Your Answer
Copy turning , Thread Rolling , Drilling

Multiple Choice Multiple Answer
Question
This Question refers to the case 'Indus Foundries Ltd.':The location of plant has been narrowed down to following locations :-
Correct Answer
Kolhapur , Ahmedabad , Coimbatore
Your Answer
Kolhapur , Ahmedabad , Coimbatore


1 comment: